Back to Search
Start Over
Estimation of uncertainty in computation of importance factors and probability of undesirable events for safety-critical multi-unit systems, based on Binary Decisions Diagrams.
- Source :
-
Nuclear Engineering & Design . Mar2024, Vol. 418, pN.PAG-N.PAG. 1p. - Publication Year :
- 2024
-
Abstract
- This paper addresses current needs of the Multi-Unit Probabilistic Safety Assessment (MUPSA) methodology, which consists of a series of eight essential steps for conducting Probabilistic Safety Assessment (PSA) in the context of a multi-unit Nuclear Power Plant (NPP), co-located on a single site. The focus of this study revolves around one of the steps of the MUPSA methodology, which includes the examination of the importance factors and uncertainty analysis. Emphasizing the role of this step within MUPSA, the paper highlights the hypothesis and estimations made, along with the determination of system importance factors and failure frequency. To illustrate the practical application of these concepts, the paper presents three illustrative examples. The first example involves a 3-terminal reliability network, while the second example features an illustrative calculation applied to a system designed for potential use in a real NPP, compared to a Monte-Carlo simulation. Moreover, the second example involves the evaluation of a medium voltage distribution system (MVDS) designed to meet the auxiliary supply requirements of a nuclear power plant. This analysis is performed using a binary decision diagram (BDD), and the results derived from the BDD evaluation are then verified with those obtained through a Monte Carlo simulation for a comprehensive comparative analysis. Finally, an uncertainty analysis is achieved using a BDD reliability model, using the results of fault trees developed by National Company SN Nuclearelectrica S.A. (SNN), Department of Nuclear Safety, in the context of the Coordinated Research Project (CRP- I31031). • A meaningful method for probabilistic estimation of uncertainty is proposed. • Plug-in estimator allows for calculating system unavailability and estimating corresponding variance. • Presented method is applicable in the uncertainty analysis for importance factors computation in Level 1 multi-unit PSA. • Adaptation of state merging scheme on large-scale systems can be further studied. [ABSTRACT FROM AUTHOR]
Details
- Language :
- English
- ISSN :
- 00295493
- Volume :
- 418
- Database :
- Academic Search Index
- Journal :
- Nuclear Engineering & Design
- Publication Type :
- Academic Journal
- Accession number :
- 175392825
- Full Text :
- https://doi.org/10.1016/j.nucengdes.2023.112890