Reinforcement learning and mixed-integer programming for power plant scheduling in low carbon systems: Comparison and hybridisation.
- Source :
-
Applied Energy . Nov2023, Vol. 349, pN.PAG-N.PAG. 1p. - Publication Year :
- 2023
-
Abstract
- Decarbonisation is driving dramatic growth in renewable power generation. This increases uncertainty in the load to be served by power plants and makes their efficient scheduling, known as the unit commitment (UC) problem, more difficult. UC is solved in practice by mixed-integer programming (MIP) methods; however, there is growing interest in emerging data-driven methods including reinforcement learning (RL). In this paper, we extensively test two MIP (deterministic and stochastic) and two RL (model-free and with lookahead) scheduling methods over a large set of test days and problem sizes, for the first time comparing the state-of-the-art of these two approaches on a level playing field. We find that deterministic and stochastic MIP consistently produce lower-cost UC schedules than RL, exhibiting better reliability and scalability with problem size. Average operating costs of RL are more than 2 times larger than stochastic MIP for a 50-generator test case, while the cost is 13 times larger in the worst instance. However, the key strength of RL is the ability to produce solutions practically instantly, irrespective of problem size. We leverage this advantage to produce various initial solutions for warm starting concurrent stochastic MIP solves. By producing several near-optimal solutions simultaneously and then evaluating them using Monte Carlo methods, the differences between the true cost function and the discrete approximation required to formulate the MIP are exploited. The resulting hybrid technique outperforms both the RL and MIP methods individually, reducing total operating costs by 0.3% on average. • Compare reinforcement learning and mixed-integer programming for solving unit commitment. • Applied to low carbon power systems with high renewable forecast uncertainty. • MIP outperforms RL, progress is needed in RL scalability and reliability. • A new hybrid methodology is proposed, using RL to warm start the stochastic MIP. • This hybrid method outperforms both RL and MIP individually. [ABSTRACT FROM AUTHOR]
- Subjects :
- *REINFORCEMENT learning
*POWER plants
*COST functions
*OPERATING costs
*SCHEDULING
Subjects
Details
- Language :
- English
- ISSN :
- 03062619
- Volume :
- 349
- Database :
- Academic Search Index
- Journal :
- Applied Energy
- Publication Type :
- Academic Journal
- Accession number :
- 171922048
- Full Text :
- https://doi.org/10.1016/j.apenergy.2023.121659