Cite
Productivity and Cost Assessment for Continuous Flight Auger Piles.
MLA
Zayed, Tarek M. “Productivity and Cost Assessment for Continuous Flight Auger Piles.” Journal of Construction Engineering & Management, vol. 131, no. 6, June 2005, pp. 677–88. EBSCOhost, https://doi.org/10.1061/(ASCE)0733-9364(2005)131:6(677).
APA
Zayed, T. M. (2005). Productivity and Cost Assessment for Continuous Flight Auger Piles. Journal of Construction Engineering & Management, 131(6), 677–688. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:6(677)
Chicago
Zayed, Tarek M. 2005. “Productivity and Cost Assessment for Continuous Flight Auger Piles.” Journal of Construction Engineering & Management 131 (6): 677–88. doi:10.1061/(ASCE)0733-9364(2005)131:6(677).