Cite
Automatic work package sizing for cost-effective modular construction.
MLA
Liu, Zisheng, et al. “Automatic Work Package Sizing for Cost-Effective Modular Construction.” Automation in Construction, vol. 154, Oct. 2023, p. N.PAG. EBSCOhost, https://doi.org/10.1016/j.autcon.2023.105003.
APA
Liu, Z., Li, X., Wu, C., Ma, J., Yang, Z., & Guo, Y. (2023). Automatic work package sizing for cost-effective modular construction. Automation in Construction, 154, N.PAG. https://doi.org/10.1016/j.autcon.2023.105003
Chicago
Liu, Zisheng, Xiao Li, Chengke Wu, Jun Ma, Zhile Yang, and Yuanjun Guo. 2023. “Automatic Work Package Sizing for Cost-Effective Modular Construction.” Automation in Construction 154 (October): N.PAG. doi:10.1016/j.autcon.2023.105003.