Back to Search Start Over

1.0 Billion M3/A Capacity in Daniudi Gas Field under Constru ction.

Source :
China Chemical Reporter. 4/16/2005, Vol. 16 Issue 11, p13-13. 1/4p.
Publication Year :
2005

Abstract

The article reports that Sinopec Co. Ltd. has announced in Erdos that the construction of the 1.0 billion meter square per annum capacity in Daniudi Gas Field was launched. The construction of the 1.0 billion meter square a capacity in Daniudi is the biggest natural gas development project of Sinopec after its reformation. In the natural gas exploration north of Erdosin Xinjiang, proven reserves of over 50 billion meter square have been reported for 3 consecutive years. The construction of the gas transmission pipeline from Daniudi to Yulin and matched ground facilities was launched before schedule and is in smooth progress today.

Details

Language :
English
ISSN :
10021450
Volume :
16
Issue :
11
Database :
Academic Search Index
Journal :
China Chemical Reporter
Publication Type :
Periodical
Accession number :
16778400