Tie line fault ride‐through method of photovoltaic station based on cooperative strategy of energy storage, relay protection and photovoltaic inverters.
- Source :
-
IET Generation, Transmission & Distribution (Wiley-Blackwell) . Apr2023, Vol. 17 Issue 7, p1613-1623. 11p. - Publication Year :
- 2023
-
Abstract
- The fault of the tie line between the photovoltaic (PV) station and the grid is a serious fault for the PV station. It will cause the PV station to operate into an unintentional island. The uncontrolled Island voltage and frequency will inevitably lead to the disconnection of the inverter in the station. This situation will bring great losses to PV operators and impact to the power grid. In order to deal with the tie line fault, this paper analyzes the operation characteristics of PV stations in case of tie line fault firstly. Then a tie line fault ride‐through method based on cooperative strategy of small capacity energy storage (ES), relay protection and PV inverters is proposed. The islanding switching control strategies of PV and ES are designed respectively. The cooperative strategy of protection, PV controller and ES controller is formulated as well. The real‐time digital simulator (RTDS) closed‐loop test platform including line protection device, ES controller and PV controller is built to verify the effectiveness of the proposed method. [ABSTRACT FROM AUTHOR]
Details
- Language :
- English
- ISSN :
- 17518687
- Volume :
- 17
- Issue :
- 7
- Database :
- Academic Search Index
- Journal :
- IET Generation, Transmission & Distribution (Wiley-Blackwell)
- Publication Type :
- Academic Journal
- Accession number :
- 162917577
- Full Text :
- https://doi.org/10.1049/gtd2.12768