Back to Search
Start Over
A Distributed Blocking Flowshop Scheduling with Setup Times Using Multi-Factory Collaboration Iterated Greedy Algorithm.
- Source :
-
Mathematics (2227-7390) . Feb2023, Vol. 11 Issue 3, p581. 25p. - Publication Year :
- 2023
-
Abstract
- As multi-factory production models are more widespread in modern manufacturing systems, a distributed blocking flowshop scheduling problem (DBFSP) is studied in which no buffer between adjacent machines and setup time constraints are considered. To address the above problem, a mixed integer linear programming (MILP) model is first constructed, and its correctness is verified. Then, an iterated greedy-algorithm-blending multi-factory collaboration mechanism (mIG) is presented to optimize the makespan criterion. In the mIG algorithm, a rapid evaluation method is designed to reduce the time complexity, and two different iterative processes are selected by a certain probability. In addition, collaborative interactions between cross-factory and inner-factory are considered to further improve the exploitation and exploration of mIG. Finally, the 270 tests showed that the average makespan and RPI values of mIG are 1.93% and 78.35% better than the five comparison algorithms on average, respectively. Therefore, mIG is more suitable to solve the studied DBFSP_SDST. [ABSTRACT FROM AUTHOR]
Details
- Language :
- English
- ISSN :
- 22277390
- Volume :
- 11
- Issue :
- 3
- Database :
- Academic Search Index
- Journal :
- Mathematics (2227-7390)
- Publication Type :
- Academic Journal
- Accession number :
- 161857345
- Full Text :
- https://doi.org/10.3390/math11030581