Back to Search Start Over

Bridge Barrage.

Authors :
Mastaglio, Linda
Source :
ENR: Engineering News-Record. 7/11/2022, Vol. 289 Issue 1, p35-39. 5p. 6 Color Photographs.
Publication Year :
2022

Abstract

The article reports that elevated flyover at U.S. over 23rd Street in Panama City, Flaorida, allows trains to enter and exit the port without the need to stage or break the trains in order for traffic to flow. Topics include Bridging North America is a private-sector partner responsible for design, construction, financing, operation and facility maintenance; and environmental assessment will be completed this summer with right-of-way acquisition and design scheduled for summer 2023.

Details

Language :
English
ISSN :
08919526
Volume :
289
Issue :
1
Database :
Academic Search Index
Journal :
ENR: Engineering News-Record
Publication Type :
Periodical
Accession number :
157970476