Cite
BIM4D-based scheduling for assembling and lifting in precast-enabled construction.
MLA
Huang, Lihui, et al. “BIM4D-Based Scheduling for Assembling and Lifting in Precast-Enabled Construction.” Automation in Construction, vol. 133, Jan. 2022, p. N.PAG. EBSCOhost, https://doi.org/10.1016/j.autcon.2021.103999.
APA
Huang, L., Pradhan, R., Dutta, S., & Cai, Y. (2022). BIM4D-based scheduling for assembling and lifting in precast-enabled construction. Automation in Construction, 133, N.PAG. https://doi.org/10.1016/j.autcon.2021.103999
Chicago
Huang, Lihui, Roshan Pradhan, Souravik Dutta, and Yiyu Cai. 2022. “BIM4D-Based Scheduling for Assembling and Lifting in Precast-Enabled Construction.” Automation in Construction 133 (January): N.PAG. doi:10.1016/j.autcon.2021.103999.