Back to Search Start Over

The Cost-Efficiency Analysis of a System for Improving Fine-Coal Combustion Efficiency of Power Plant Boilers.

Authors :
Tic, Wilhelm Jan
Guziałowska-Tic, Joanna
Source :
Energies (19961073). Jul2021, Vol. 14 Issue 14, p4295-4295. 1p.
Publication Year :
2021

Abstract

Hard coal is widely used as a source of energy, and a number of catalysts have been developed to minimize the noxious impact of this fuel on combustion. This paper presents the cost-efficiency analysis of a system for improving the combustion of solid fuels, especially fine coal, in power boilers. The system is provided with a control and supervision device. It has been designed for better accuracy in controlling the boiler operating parameters, with a view to improving combustion efficiency due to the use of catalysts. The tests were carried out for system capacities ranging from 3 to 100 MW. It was found that, depending on the size of the system in the range of 3–100 MW, savings in the fuel consumption ranged from 2% to 8% due to the implementation of novel solutions in the boiler plant operation and from 2 to 6% due to the use of the combustion catalysts. Apart from boosting energy efficiency, the use of catalysts and the efficiency-boosting system resulted in the costs of overhauls being cut by about 20%. The payback time depends on system capacities, and it is between 6.75 and 1.74 years for capacities ranging from 3 to 75 MW and 2.0 years for a 100 MW plant. [ABSTRACT FROM AUTHOR]

Details

Language :
English
ISSN :
19961073
Volume :
14
Issue :
14
Database :
Academic Search Index
Journal :
Energies (19961073)
Publication Type :
Academic Journal
Accession number :
151588151
Full Text :
https://doi.org/10.3390/en14144295