Project time–cost analysis under generalised precedence relations
- Source :
-
Advances in Engineering Software (1992) . Oct2004, Vol. 35 Issue 10/11, p715-724. 10p. - Publication Year :
- 2004
-
Abstract
- Existing methods dealing with the time–cost trade-off problem, which is encountered in project planning, have focused on the solution of a basic problem that does not adequately represent actual engineering projects. The aim of this paper is to develop a solution method considering additional realistic project characteristics such as generalised activity precedence relations and external time constraints for particular activities. The proposed method is formulated as a linear/integer program and provides the optimal project time–cost curve and the minimum cost schedule. Evaluation results indicate that the method can be reliably applied to engineering projects. [Copyright &y& Elsevier]
- Subjects :
- *PROJECT management
*COST analysis
*LINEAR programming
*ENGINEERING
Subjects
Details
- Language :
- English
- ISSN :
- 09659978
- Volume :
- 35
- Issue :
- 10/11
- Database :
- Academic Search Index
- Journal :
- Advances in Engineering Software (1992)
- Publication Type :
- Academic Journal
- Accession number :
- 14784793
- Full Text :
- https://doi.org/10.1016/j.advengsoft.2004.03.017