Cite
Scheduling a forge with due dates and die deterioration.
MLA
Ősz, Olivér, et al. “Scheduling a Forge with Due Dates and Die Deterioration.” Annals of Operations Research, vol. 285, no. 1/2, Feb. 2020, pp. 353–67. EBSCOhost, https://doi.org/10.1007/s10479-019-03336-6.
APA
Ősz, O., Ferenczi, B., & Hegyháti, M. (2020). Scheduling a forge with due dates and die deterioration. Annals of Operations Research, 285(1/2), 353–367. https://doi.org/10.1007/s10479-019-03336-6
Chicago
Ősz, Olivér, Balázs Ferenczi, and Máté Hegyháti. 2020. “Scheduling a Forge with Due Dates and Die Deterioration.” Annals of Operations Research 285 (1/2): 353–67. doi:10.1007/s10479-019-03336-6.