Back to Search Start Over

NEW BOILER PLANT FOR RESEARCH PARK COMPLEX: USING DESIGN-BID-BUILD PROJECT DELIVERY.

Source :
Engineered Systems. Jan2020, Vol. 37 Issue 1, p12-13. 2p.
Publication Year :
2020

Abstract

The article focuses on Design-Bid-Build (DBB). It mentions the Heating, ventilation, and air conditioning (HVAC) design criteria shall be in sync with the project delivery method and the owner' building program requirements; and also mentions the new central plant hot water system shall include primary pumps per boiler and secondary pumps with variable frequency drives (VFDs).

Details

Language :
English
ISSN :
08919976
Volume :
37
Issue :
1
Database :
Academic Search Index
Journal :
Engineered Systems
Publication Type :
Periodical
Accession number :
140950313