Back to Search
Start Over
NEW BOILER PLANT FOR RESEARCH PARK COMPLEX: USING DESIGN-BID-BUILD PROJECT DELIVERY.
- Source :
-
Engineered Systems . Jan2020, Vol. 37 Issue 1, p12-13. 2p. - Publication Year :
- 2020
-
Abstract
- The article focuses on Design-Bid-Build (DBB). It mentions the Heating, ventilation, and air conditioning (HVAC) design criteria shall be in sync with the project delivery method and the owner' building program requirements; and also mentions the new central plant hot water system shall include primary pumps per boiler and secondary pumps with variable frequency drives (VFDs).
Details
- Language :
- English
- ISSN :
- 08919976
- Volume :
- 37
- Issue :
- 1
- Database :
- Academic Search Index
- Journal :
- Engineered Systems
- Publication Type :
- Periodical
- Accession number :
- 140950313