Cite
Cost-effectiveness analysis and evaluation of a 'three-old' reconstruction project based on smart system.
MLA
Wang, Dong, et al. “Cost-Effectiveness Analysis and Evaluation of a ‘Three-Old’ Reconstruction Project Based on Smart System.” Cluster Computing, vol. 22, July 2019, pp. 7895–905. EBSCOhost, https://doi.org/10.1007/s10586-017-1490-3.
APA
Wang, D., Liu, J., Wang, X., & Chen, Y. (2019). Cost-effectiveness analysis and evaluation of a “three-old” reconstruction project based on smart system. Cluster Computing, 22, 7895–7905. https://doi.org/10.1007/s10586-017-1490-3
Chicago
Wang, Dong, Jingkuang Liu, Xuetong Wang, and Yujing Chen. 2019. “Cost-Effectiveness Analysis and Evaluation of a ‘Three-Old’ Reconstruction Project Based on Smart System.” Cluster Computing 22 (July): 7895–7905. doi:10.1007/s10586-017-1490-3.