Cite
A method of direct, real-time forecasting of downstream water levels via hydropower station reregulation: A case study from Gezhouba Hydropower Plant, China.
MLA
Shang, Yizi, et al. “A Method of Direct, Real-Time Forecasting of Downstream Water Levels via Hydropower Station Reregulation: A Case Study from Gezhouba Hydropower Plant, China.” Journal of Hydrology, vol. 573, June 2019, pp. 895–907. EBSCOhost, https://doi.org/10.1016/j.jhydrol.2019.04.017.
APA
Shang, Y., Xu, Y., Shang, L., Fan, Q., Wang, Y., & Liu, Z. (2019). A method of direct, real-time forecasting of downstream water levels via hydropower station reregulation: A case study from Gezhouba Hydropower Plant, China. Journal of Hydrology, 573, 895–907. https://doi.org/10.1016/j.jhydrol.2019.04.017
Chicago
Shang, Yizi, Yang Xu, Ling Shang, Qixiang Fan, Yongyi Wang, and Zhiwu Liu. 2019. “A Method of Direct, Real-Time Forecasting of Downstream Water Levels via Hydropower Station Reregulation: A Case Study from Gezhouba Hydropower Plant, China.” Journal of Hydrology 573 (June): 895–907. doi:10.1016/j.jhydrol.2019.04.017.