Back to Search Start Over

Acceleration grid power supply conversion system of the MITICA neutral beam injector: On site integration activities and tests.

Authors :
Zanotto, L.
Dan, M.
Toigo, V.
Ferrari, F.
Zella, D.
Gutierrez, D.
Huart, M.
Decamps, H.
Perna, M.
Merli, E.
Finotti, C.
Guarda, F.
Panizza, C.
Source :
Fusion Engineering & Design. Sep2019:Part B, Vol. 146, p2238-2241. 4p.
Publication Year :
2019

Abstract

The Acceleration Grid Power Supply Conversion System (AGPS-CS) of the MITICA Neutral Beam Injector has been installed between late 2017 - early 2018 and commissioned in the first half of 2018. This paper is focused on the installation and commissioning activities, with emphasis on the integration issues. The results of the site and acceptance tests are presented, proving the capability of the system to deliver the specified performance. [ABSTRACT FROM AUTHOR]

Details

Language :
English
ISSN :
09203796
Volume :
146
Database :
Academic Search Index
Journal :
Fusion Engineering & Design
Publication Type :
Academic Journal
Accession number :
138692873
Full Text :
https://doi.org/10.1016/j.fusengdes.2019.03.161