Reprint of: Expansion development planning of thermocracking-based bitumen upgrading plant under uncertainty.
- Source :
-
Computers & Chemical Engineering . Aug2018, Vol. 116, p352-367. 16p. - Publication Year :
- 2018
-
Abstract
- Highlights • Proposed a multistage stochastic programming model for bitumen upgrading plant capacity expansion planning. • Solved the stochastic programming problem through linear decision rule based method. • Addressed synthetic crude oil price uncertainty through time series model and constructed uncertainty set. • Results show that the effect of CO 2 tax rate uncertainty on the expansion planning is not significant. Abstract Expansion development of upgrading plants is an important decision to make for the oil sands industry. In this paper, we propose a multistage stochastic expansion development method to tackle uncertain synthetic crude oil (SCO) and CO 2 tax prices. The linear decision rule based technique is applied to solve the proposed stochastic optimization model. Various analyses are conducted based on optimization results: (i) effects of the uncertainty set size, (ii) comparison of solutions for selected pessimistic, realistic, and optimistic scenarios, (iii) effects of different operating modes for an upgrading plant, and (iv) cost distribution. Results of this work demonstrate that the stochastic model provides a more flexible, economical, and robust solution compared to the deterministic solution. In addition, the CO 2 tax price affects the optimal solution negligibly compared to the SCO price. Finally, expansion development of the studied upgrading plant is economically beneficial even at the current market state. [ABSTRACT FROM AUTHOR]
Details
- Language :
- English
- ISSN :
- 00981354
- Volume :
- 116
- Database :
- Academic Search Index
- Journal :
- Computers & Chemical Engineering
- Publication Type :
- Academic Journal
- Accession number :
- 132627604
- Full Text :
- https://doi.org/10.1016/j.compchemeng.2018.10.014