Cite
The Optimization of Large-scale Intermittent Energy Power Operation in Monthly and Yearly.
MLA
Tie-Qiang Wang, et al. “The Optimization of Large-Scale Intermittent Energy Power Operation in Monthly and Yearly.” AIP Conference Proceedings, vol. 1978, no. 1, May 2018, pp. 1–7. EBSCOhost, https://doi.org/10.1063/1.5043861.
APA
Tie-Qiang Wang, Fang Liu, Xin Cao, Chen-Jun Sun, Zhi-Ce Yang, & Jue Wang. (2018). The Optimization of Large-scale Intermittent Energy Power Operation in Monthly and Yearly. AIP Conference Proceedings, 1978(1), 1–7. https://doi.org/10.1063/1.5043861
Chicago
Tie-Qiang Wang, Fang Liu, Xin Cao, Chen-Jun Sun, Zhi-Ce Yang, and Jue Wang. 2018. “The Optimization of Large-Scale Intermittent Energy Power Operation in Monthly and Yearly.” AIP Conference Proceedings 1978 (1): 1–7. doi:10.1063/1.5043861.