港珠澳大桥江海直达船航道桥主墩承台施工.

Authors :
田睿
何荣坚
Source :
China Harbour Engineering. 2018, Vol. 38 Issue 5, p60-73. 5p.
Publication Year :
2018

Abstract

The main pier pile caps of the channel bridge for river-sea direct ships of the Hongkong-Zhuhai-Macao Bridge are constructed with bottom steel boxed cofferdam construction. The meteorological hydrological conditions of the bridge site are complex, pile caps is big volume, a variety of embedded devices, anticorrosive demand is high, we adopted the bottom boxes and combined with the anti-collision structure. The casing and the bottom plate are subdivided, and the whole assembly of the box is finished and transported to the site and the floating crane is hoisted. The platform adopts the underwater concrete cover, and the weight of the bottom concrete, the box side mould and the bottom plate are all borne by the fine steel. The construction method provides reference for subsequent construction. [ABSTRACT FROM AUTHOR]

Details

Language :
Chinese
ISSN :
20957874
Volume :
38
Issue :
5
Database :
Academic Search Index
Journal :
China Harbour Engineering
Publication Type :
Academic Journal
Accession number :
130130948
Full Text :
https://doi.org/10.7640/zggwjs201805014