Back to Search Start Over

Construction and Test Results of Coils 2 and 3 of a 3-Nested-Coil 800-MHz REBCO Insert for the MIT 1.3-GHz LTS/HTS NMR Magnet.

Authors :
Dongkeun Park
Bascuñán, Juan
Michael, Philip C.
Jiho Lee
Seungyong Hahn
Yukikazu Iwasa
Source :
IEEE Transactions on Applied Superconductivity. Apr2018, Vol. 28 Issue 3, p1-5. 5p.
Publication Year :
2018

Abstract

We present the construction and test results of Coils 2 and 3 of a 3-coil 800-MHz REBCO insert (H800) for the MIT 1.3 GHz LTS/HTS NMR magnet currently under construction. Each of three H800 coils (Coils 1-3) is a stack of no-insulation REBCO double pancakes (DPs). The innermost 8.67-T Coil 1 (26 DPs) was completed in 2016; the middle 5.64-T Coil 2 (32 DPs) has been wound, assembled, and tested; and for the outermost 4.44-T Coil 3, its 38 DPs have been wound and preliminary tests were performed to characterize each DP at 77 K. Included for Coil 2 are: 1) 77-K data of critical current, index, and turn-to-turn characteristic resistivity of eachDP; 2) stacking order of the 32 DPs optimized to maximize the Coil 2 current margin and minimize its Joule dissipation in the pancake-to-pancake joints; 3) procedure to experimentally determine and apply a room-temperature preload to the DP stack; 4) 77- and 4.2-K test results after each of 64 pancakes was over-banded with a 75-μm-thick stainless steel tape for a radial thickness of 5 mm. Presented for each DP in Coil 3 are 77-K dada of critical current, index, and turn-to-turn characteristic resistivity. [ABSTRACT FROM AUTHOR]

Details

Language :
English
ISSN :
10518223
Volume :
28
Issue :
3
Database :
Academic Search Index
Journal :
IEEE Transactions on Applied Superconductivity
Publication Type :
Academic Journal
Accession number :
128726307
Full Text :
https://doi.org/10.1109/TASC.2017.2780043