Back to Search Start Over

TEMPORARY AIR CONDITIONING.

Authors :
Parolise, Amanda
Source :
Engineered Systems. Apr2017, Vol. 34 Issue 4, p23-23. 1p.
Publication Year :
2017

Abstract

The article focuses on air conditioning in emergency shelter center in high school as the heating system and its primary heating equipment are part of the existing infrastructure. Topics discussed include existing heating system pipe distribution has valve and capped chilled water supply and return pipes, temporary HVAC contractor to drive up the flatbed truck and air-cooled rental chiller shall be furnished with all required temperature and pressure gages, water strainers and safety alarms.

Details

Language :
English
ISSN :
08919976
Volume :
34
Issue :
4
Database :
Academic Search Index
Journal :
Engineered Systems
Publication Type :
Periodical
Accession number :
122281929