Cite
A Lagrangian relaxation-based heuristic for the multi-ship quay crane scheduling problem with ship stability constraints.
MLA
Al-Dhaheri, Noura, and Ali Diabat. “A Lagrangian Relaxation-Based Heuristic for the Multi-Ship Quay Crane Scheduling Problem with Ship Stability Constraints.” Annals of Operations Research, vol. 248, no. 1/2, Jan. 2017, pp. 1–24. EBSCOhost, https://doi.org/10.1007/s10479-016-2239-8.
APA
Al-Dhaheri, N., & Diabat, A. (2017). A Lagrangian relaxation-based heuristic for the multi-ship quay crane scheduling problem with ship stability constraints. Annals of Operations Research, 248(1/2), 1–24. https://doi.org/10.1007/s10479-016-2239-8
Chicago
Al-Dhaheri, Noura, and Ali Diabat. 2017. “A Lagrangian Relaxation-Based Heuristic for the Multi-Ship Quay Crane Scheduling Problem with Ship Stability Constraints.” Annals of Operations Research 248 (1/2): 1–24. doi:10.1007/s10479-016-2239-8.