Back to Search
Start Over
Solugas – Comprehensive analysis of the solar hybrid Brayton plant.
- Source :
-
Solar Energy . Oct2016, Vol. 135, p578-589. 12p. - Publication Year :
- 2016
-
Abstract
- This article presents the first megawatt scale solar-hybrid plant with a solarized gas turbine. The works and improvements that made the Solugas project succeed during design, construction and long-term solar operation are described and explained. More than 1000 operation hours and receiver outlet temperatures of 800 °C were achieved. The operation behaviour and performance of the key components – the solar pressurised air receiver and the gas turbine – are presented here as a proof of the high potential of the technology. [ABSTRACT FROM AUTHOR]
Details
- Language :
- English
- ISSN :
- 0038092X
- Volume :
- 135
- Database :
- Academic Search Index
- Journal :
- Solar Energy
- Publication Type :
- Academic Journal
- Accession number :
- 117443503
- Full Text :
- https://doi.org/10.1016/j.solener.2016.06.020