Back to Search Start Over

Modelling supply chain inventory system with controllable lead time under price-dependent demand.

Authors :
Giri, B.
Roy, B.
Source :
International Journal of Advanced Manufacturing Technology. Jun2016, Vol. 84 Issue 9-12, p1861-1871. 11p.
Publication Year :
2016

Abstract

In this paper, we study a two-echelon supply chain inventory system with a single manufacturer and a single buyer, considering price-dependent demand and variable lead time. Lead time can be reduced by added crashing cost. We first assume that the lead time demand follows a normal probability distribution and then consider the case where it is distribution free. We develop both the centralized and decentralized models and derive the optimal solutions by using profit maximization criterion. Feasibility and efficiency of the proposed models are justified through two numerical examples. We numerically investigate how the optimal decisions are affected by changes in various model-parameters. From numerical study, we observe that even though the lead time reduction diminishes the retailer's selling price, it enhances the system profit significantly. [ABSTRACT FROM AUTHOR]

Details

Language :
English
ISSN :
02683768
Volume :
84
Issue :
9-12
Database :
Academic Search Index
Journal :
International Journal of Advanced Manufacturing Technology
Publication Type :
Academic Journal
Accession number :
115528425
Full Text :
https://doi.org/10.1007/s00170-015-7829-0