Back to Search Start Over

Makespan Analysis of Lot Switching Period in Cluster Tools.

Authors :
Lee, Jun-Ho
Kim, Hyun-Jung
Source :
IEEE Transactions on Semiconductor Manufacturing. May2016, Vol. 29 Issue 2, p127-136. 10p.
Publication Year :
2016

Abstract

Cluster tools each of which consists of processing modules, a transport robot, and loadlocks perform most wafer fabrication processes in semiconductor manufacturing. Recently, the lot size has been decreasing from 25 wafers to even 7–8 wafers due to the larger wafer size and circuit width reduction especially in large-scale integration manufacturing. Hence, the lot switching operation between two consecutive wafer lots occurs frequently. In this paper, we derive closed-form expressions of the makespan of the lot switching period in single-armed and dual-armed cluster tools with the given robot task sequences for the first time. With this research, the completion time of a wafer lot can be easily estimated even though its preceding or next lot is processed together during the lot switching period. Hence, the makespan can be used for integrating operation of overhead hoist transports and cluster tools and assigning wafer lots to cluster tools while minimizing the lot switching period. [ABSTRACT FROM AUTHOR]

Details

Language :
English
ISSN :
08946507
Volume :
29
Issue :
2
Database :
Academic Search Index
Journal :
IEEE Transactions on Semiconductor Manufacturing
Publication Type :
Academic Journal
Accession number :
115245778
Full Text :
https://doi.org/10.1109/TSM.2016.2530810