Quality monitoring of metro grouting behind segment using ground penetrating radar.

Authors :
Yu, Qi-ming
Zhou, Hui-lin
Wang, Yu-hao
Duan, Rong-xing
Source :
Construction & Building Materials. May2016, Vol. 110, p189-200. 12p.
Publication Year :
2016

Abstract

In this paper, a survey of the Nanchang Metro Line 1 is completed to determine the effectiveness of a grout assessment method combines GPR and image processing. Two aspects are used as a basis: one is to estimate the thickness of the grouting layer, and the other is to determine the presence and distribution of any damage. Finite-difference time-domain simulation is used to assist the interpretation of measured data. The results show most grouting layer is approximately 30 cm thick (i.e., the standard 30 cm). Several defects in the grouting layer were also found, primarily voids, crack or fissure. [ABSTRACT FROM AUTHOR]

Details

Language :
English
ISSN :
09500618
Volume :
110
Database :
Academic Search Index
Journal :
Construction & Building Materials
Publication Type :
Academic Journal
Accession number :
113793907
Full Text :
https://doi.org/10.1016/j.conbuildmat.2015.12.109