Back to Search Start Over

INTEGRATED BATCH PLANNING OPTIMIZATION BASED ON FUZZY GENETIC AND CONSTRAINT SATISFACTION FOR STEEL PRODUCTION.

Authors :
Su, L.
Qi, Y.
Jin, L. -L.
Zhang, G. -L.
Source :
International Journal of Simulation Modelling (IJSIMM). Mar2016, Vol. 15 Issue 1, p133-143. 11p.
Publication Year :
2016

Abstract

This paper stablishes the model of the integrated batch planning process, and proposes an improved algorithm for this problem. The simulation results of a computerized scheduling system are given to prove the fitness of the model. The steel making casting production process scheduling problem is very difficult to get a good performance solution in practice. The scheduling of steelmaking casting production is a complicated problem of combinational optimization in the hybrid flow shop, which is an NP-Hard problem, and determining the polynomial time algorithm to arrive at the accurate optimal solution has proved to be a difficult task. An improved fuzzy genetic optimization and improved algorithm strategy are proposed. The results show that the method is very efficient in solving the steel casting production scheduling problem. [ABSTRACT FROM AUTHOR]

Details

Language :
English
ISSN :
17264529
Volume :
15
Issue :
1
Database :
Academic Search Index
Journal :
International Journal of Simulation Modelling (IJSIMM)
Publication Type :
Academic Journal
Accession number :
113619063
Full Text :
https://doi.org/10.2507/IJSIMM15(1)CO1