Back to Search Start Over

A single-manufacturer multi-buyer supply chain inventory model with controllable lead time and price-sensitive demand.

Authors :
Giri, B.C.
Roy, B.
Source :
Journal of Industrial & Production Engineering. Dec2015, Vol. 32 Issue 8, p516-527. 12p.
Publication Year :
2015

Abstract

The paper considers a two-echelon supply chain inventory model with one manufacturer and multiple buyers in which each buyer’s demand is dependent on the selling price of the product. The manufacturer’s lead time is composed of several components and each component can be reduced by an additional crashing cost. We develop the proposed model assuming that the lead time demand follows a normal distribution or it is distribution free. The optimal decisions are obtained by maximizing the total expected profit of the supply chain. It is observed from numerical study that the lead time reduction has minor effect on the selling price of the product, but it enhances the profit of the supply chain system. [ABSTRACT FROM AUTHOR]

Details

Language :
English
ISSN :
21681015
Volume :
32
Issue :
8
Database :
Academic Search Index
Journal :
Journal of Industrial & Production Engineering
Publication Type :
Academic Journal
Accession number :
110527118
Full Text :
https://doi.org/10.1080/21681015.2015.1086442