Back to Search
Start Over
Building Program To Basis Of Design For A New Kindergarten Addition To An Existing K-6 Grade School.
- Source :
-
Engineered Systems . May2015, Vol. 32 Issue 5, p24-24. 1p. - Publication Year :
- 2015
-
Abstract
- The article presents a sample of an HVAC (heating, ventilation and air-conditioning) annual operating budget add-on to a current K-6th grade operating budget at the conceptual phase of a building addition project. A successful and sustainable building program includes an operating and construction budget. Fifteen to 20% of the cost of a building is first cost while the operation of the building over its life makes up 80% or more of the cost to own a building.
Details
- Language :
- English
- ISSN :
- 08919976
- Volume :
- 32
- Issue :
- 5
- Database :
- Academic Search Index
- Journal :
- Engineered Systems
- Publication Type :
- Periodical
- Accession number :
- 102952367