Back to Search Start Over

Building Program To Basis Of Design For A New Kindergarten Addition To An Existing K-6 Grade School.

Authors :
Parolise, Amanda
Source :
Engineered Systems. May2015, Vol. 32 Issue 5, p24-24. 1p.
Publication Year :
2015

Abstract

The article presents a sample of an HVAC (heating, ventilation and air-conditioning) annual operating budget add-on to a current K-6th grade operating budget at the conceptual phase of a building addition project. A successful and sustainable building program includes an operating and construction budget. Fifteen to 20% of the cost of a building is first cost while the operation of the building over its life makes up 80% or more of the cost to own a building.

Details

Language :
English
ISSN :
08919976
Volume :
32
Issue :
5
Database :
Academic Search Index
Journal :
Engineered Systems
Publication Type :
Periodical
Accession number :
102952367