872 results on '"mine planning"'
Search Results
2. The future of underground mine planning in the era of machine learning: Opportunities for engineering robustness and flexibility.
3. Short-term underground mine planning with uncertain activity durations using constraint programming.
4. A Systems Engineering Approach to Incorporate ESG Risks and Opportunities in Early-Stage Mine Design and Planning
5. Integrated stochastic optimisation of stope design and long-term production scheduling at an operating underground copper mine.
6. A Systems Engineering Approach to Incorporate ESG Risks and Opportunities in Early-Stage Mine Design and Planning.
7. Continuous Cash Flow Modelling for Economic Evaluation and Risk Analysis in Mine Planning Using Monte Carlo Simulation.
8. A Sustainability Approach to Optimize the Closure of Continuous Surface Lignite Mines
9. Visualizing and Quantifying Uncertainty in Cut-off Grade Selection
10. Risk-Based Optimization of Post-Blast Dig-Limits Incorporating Blast Movement and Grade Uncertainties with Multiple Destinations in Open-Pit Mines
11. Application of Simulation and Optimization to Support Mine Plan Execution
12. A Constraint Programming approach to solve the clustering problem in open-pit mine planning.
13. Incorporating grade uncertainty into open-pit long-term production planning using loss and profit functions
14. New Approach on the Development of Operational Fleet Management Systems Using Adaptative AI Techniques: Analysis of Adaptative Goal Weights
15. Technology is key to green coal mining
16. Stochastic Optimization for Long-Term Planning of a Mining Complex with In-Pit Crushing and Conveying Systems
17. Incorporating grade uncertainty into open-pit long-term production planning using loss and profit functions.
18. Qualification of geotechnical parameters with 3D geotechnical modelling to improve mine planning reliability.
19. Improvements in Rock Mass Description for Stope Design by Geophysical and Geochemical Methods.
20. A Mixed Integer Programming optimization model for mining truck dispatch policies using traffic constraints: Case of a copper mine in northern Chile.
21. A Constraint Programming approach to solve the clustering problem in open-pit mine planning
22. 3-D Modelling and Reserve Estimation for a Copper Deposit
23. Optimal control approaches for open pit planning.
24. Application of Mining Width-Constrained Open Pit Mine Production Scheduling Problem to the Medium-Term Planning of Radomiro Tomic Mine: A Case Study
25. Assessing Dilution, Ore Loss, and Profit Differences from Various Hand-Drawn Dig Limits Compared to Optimal Ore-Waste Delineations in Deposits of Variable Heterogeneity
26. Risk in Ultimate Pit Selection
27. Mine Planning
28. Implementation of Software DESWIK® for a polymetallic deposit (Cu - Au).
29. Multivariate Geostatistical Simulation and Deep Q-Learning to Optimize Mining Decisions.
30. Performance indicators and their importance for effective short-term and operational mine planning
31. Advanced Analytics for Surface Extraction
32. Advanced Analytics for Surface Mine Planning
33. Advanced Analytics for Surface Mining
34. Conceptual 3D Modeling and Direct Block Scheduling of a Massive Seafloor Sulfide Occurrence
35. Development and analysis of a methodology to generate operational open-pit mine ramp designs automatically.
36. Improvements in Rock Mass Description for Stope Design by Geophysical and Geochemical Methods
37. Optimum Fleet Selection Using Machine Learning Algorithms—Case Study: Zenouz Kaolin Mine
38. Optimal junction localization minimizing maximum miners' evacuation distance in underground mining network.
39. A model for open-pit pushback design with operational constraints.
40. Environmental Noise Impact Assessment for Large-Scale Surface Mining Operations in Serbia.
41. Performance indicators and their importance for effective short-term and operational mine planning.
42. USE OF INTEGRATED AHP-TOPSIS METHOD IN SELECTION OF OPTIMUM MINE PLANNING FOR OPEN-PIT MINES.
43. SEEING, THINKING, DOING – A MULTIFACETED MODEL TO EMBRACE UNCERTAINTY IN MINE PLANNING
44. Open Pit Mine Scheduling Model Considering Blending and Stockpiling
45. Comparison of Methods to Define the Final Pit - A Case Study
46. Keynote Paper: Some Perspectives on Implications of Top Globally Ranked Factors Affecting Mining on the Future of Mine Planning
47. Review of Mathematical Models Applied in Open-Pit Mining
48. A Review of Current Scheduling and Design Practices in the Powder River Basin
49. Establishing the quantitative and qualitative limits of the applicability of the multi-stage dumping sequence in open pit mining.
50. Optimum Fleet Selection Using Machine Learning Algorithms—Case Study: Zenouz Kaolin Mine.
Catalog
Books, media, physical & digital resources
Discovery Service for Jio Institute Digital Library
For full access to our library's resources, please sign in.