Search

Your search keyword '"mine planning"' showing total 872 results

Search Constraints

Start Over You searched for: Descriptor "mine planning" Remove constraint Descriptor: "mine planning"
872 results on '"mine planning"'

Search Results

2. The future of underground mine planning in the era of machine learning: Opportunities for engineering robustness and flexibility.

3. Short-term underground mine planning with uncertain activity durations using constraint programming.

4. A Systems Engineering Approach to Incorporate ESG Risks and Opportunities in Early-Stage Mine Design and Planning

5. Integrated stochastic optimisation of stope design and long-term production scheduling at an operating underground copper mine.

6. A Systems Engineering Approach to Incorporate ESG Risks and Opportunities in Early-Stage Mine Design and Planning.

7. Continuous Cash Flow Modelling for Economic Evaluation and Risk Analysis in Mine Planning Using Monte Carlo Simulation.

8. A Sustainability Approach to Optimize the Closure of Continuous Surface Lignite Mines

12. A Constraint Programming approach to solve the clustering problem in open-pit mine planning.

13. Incorporating grade uncertainty into open-pit long-term production planning using loss and profit functions

17. Incorporating grade uncertainty into open-pit long-term production planning using loss and profit functions.

18. Qualification of geotechnical parameters with 3D geotechnical modelling to improve mine planning reliability.

19. Improvements in Rock Mass Description for Stope Design by Geophysical and Geochemical Methods.

20. A Mixed Integer Programming optimization model for mining truck dispatch policies using traffic constraints: Case of a copper mine in northern Chile.

21. A Constraint Programming approach to solve the clustering problem in open-pit mine planning

22. 3-D Modelling and Reserve Estimation for a Copper Deposit

23. Optimal control approaches for open pit planning.

27. Mine Planning

28. Implementation of Software DESWIK® for a polymetallic deposit (Cu - Au).

29. Multivariate Geostatistical Simulation and Deep Q-Learning to Optimize Mining Decisions.

30. Performance indicators and their importance for effective short-term and operational mine planning

35. Development and analysis of a methodology to generate operational open-pit mine ramp designs automatically.

36. Improvements in Rock Mass Description for Stope Design by Geophysical and Geochemical Methods

37. Optimum Fleet Selection Using Machine Learning Algorithms—Case Study: Zenouz Kaolin Mine

38. Optimal junction localization minimizing maximum miners' evacuation distance in underground mining network.

39. A model for open-pit pushback design with operational constraints.

40. Environmental Noise Impact Assessment for Large-Scale Surface Mining Operations in Serbia.

41. Performance indicators and their importance for effective short-term and operational mine planning.

42. USE OF INTEGRATED AHP-TOPSIS METHOD IN SELECTION OF OPTIMUM MINE PLANNING FOR OPEN-PIT MINES.

43. SEEING, THINKING, DOING – A MULTIFACETED MODEL TO EMBRACE UNCERTAINTY IN MINE PLANNING

49. Establishing the quantitative and qualitative limits of the applicability of the multi-stage dumping sequence in open pit mining.

50. Optimum Fleet Selection Using Machine Learning Algorithms—Case Study: Zenouz Kaolin Mine.

Catalog

Books, media, physical & digital resources