Search

Your search keyword '"Zeyad S. M. Khaled"' showing total 24 results

Search Constraints

Start Over You searched for: Author "Zeyad S. M. Khaled" Remove constraint Author: "Zeyad S. M. Khaled"
24 results on '"Zeyad S. M. Khaled"'

Search Results

1. Implementation of Prefabricated Building Systems in Iraq

2. Prediction of Shear Strength Parameters of Gypseous Soil using Artificial Neural Networks

3. Effect of Seismic Loading on Variation of Pore Water Pressure During Pile Pull-Out Tests in Sandy Soils

4. Response of Different Machine Foundation Shapes Resting on Dry Sand to Dynamic Loading

5. A Framework to Embed Sustainability Concepts into the Design Processof Construction Projects in Iraq

6. Predicting the Delivery Time of Public School Building Projects Using Nonlinear Regression

7. Development of Construction Material Waste Management System

8. Forecasting the Final Cost of Iraqi Public School Projects Using Regression Analysis

9. Effect of Using Internal Steel Plates for Shear Reinforcement on Flexural Behavior of Self-Compacting Concrete Beams

10. Modeling Contractor’s Cash-in-Flow in Public School Building Projects in Karbala

11. POTENTIALS OF EMPLOYING LEAN CONSTRUCTION IN IRAQ

12. Response of Different Machine Foundation Shapes Resting on Dry Sand to Dynamic Loading

13. Effect of Seismic Loading on Variation of Pore Water Pressure During Pile Pull-Out Tests in Sandy Soils

15. Assessment of Changes in Shear Strength Parameters for Soils below Circular Machine Foundation

16. Forecasting the Compressibility Parameters of Gypseous Soil using Artificial Neural Networks

17. Python Interactive Cost Control System for Major Contractors

18. Numerical Model of Seepage Analysis and Slope Stability for Horan Dam H4 in Iraq

20. Effect of mode of vibration on the response of machine foundation on sand

21. Effect of Embedment Depth for Circular Footing on the Amplitude of Displacement under Dynamic Load

22. Creating A Fuzzy Logic Model for Early Assessment o Payment Problems in Construction Projects In Iraq

23. Modeling the Completion Time of Public School Building Projects Using Neural Networks

Catalog

Books, media, physical & digital resources