Search

Your search keyword '"Zanotto, L."' showing total 482 results

Search Constraints

Start Over You searched for: Author "Zanotto, L." Remove constraint Author: "Zanotto, L."
482 results on '"Zanotto, L."'

Search Results

1. Integration studies of RF solid-state generators in the electrical system of NBTF experiments and ITER HNB

2. Spider Ion Source and Extraction Power Supplies -- An update of the design after four years of operation

3. Lessons learned after three years of SPIDER operation and the first MITICA integrated tests

8. On the road to ITER NBIs: SPIDER improvement after first operation and MITICA construction progress

10. Highlights of recent SPIDER results and improvements

11. SPIDER, the Negative Ion Source Prototype for ITER: Overview of Operations and Cesium Injection

12. Lessons learned after three years of SPIDER operation and the first MITICA integrated tests

13. SPIDER in the roadmap of the ITER neutral beams

15. Spider beam source ready for operation

16. Highlights of recent SPIDER results and improvements

17. FCC-hh: The Hadron Collider: Future Circular Collider Conceptual Design Report Volume 3

18. HE-LHC: The High-Energy Large Hadron Collider: Future Circular Collider Conceptual Design Report Volume 4

19. FCC-ee: The Lepton Collider: Future Circular Collider Conceptual Design Report Volume 2

20. Lessons learned after three years of SPIDER operation and the first MITICA integrated tests

21. A substantial step forward in the realization of the ITER HNB system: The ITER NBI Test Facility

22. Dynamics of ultralow- q plasmas in the RFX-mod device

26. FCC Physics Opportunities: Future Circular Collider Conceptual Design Report Volume 1

27. Supercontinua from Multimodal HCFs

28. SPIDER, the Negative Ion Source Prototype for ITER: Overview of Operations and Cesium Injection

29. Strategy for Vacuum Insulation Tests of MITICA 1 MV Electrostatic Accelerator

30. On the road to ITER NBIs: SPIDER improvement after first operation and MITICA construction progress

31. First operations with caesium of the negative ion source SPIDER

32. Dynamics of ultralow-q plasmas in the RFX-mod device

33. 4-GW Few-Cycle Visible Pulse Generation via Fiber Mode Mixing

37. FCC-ee: The Lepton Collider: Future Circular Collider Conceptual Design Report Volume 2

38. Progress in the ITER neutral beam test facility

39. HE-LHC: The High-Energy Large Hadron Collider: Future Circular Collider Conceptual Design Report Volume 4

40. The natural history and surgical outcome of patients with scimitar syndrome: a multi-centre European study

41. Preparation of the vacuum insulation tests on the MITICA 1 MV electrostatic Accelerator

42. The ITER full size plasma source device design

43. Technical Specifications for the procurement of solid state RF amplifiers for SPIDER and MITICA

44. Status of the upgrade of RFX-mod2

45. Achievement of DC 1 MV insulation in high-voltage power supply for ITER Neutral Beam Test Facility

46. Dynamics and Confinement of Ultralow-q Plasmasin the RFX-mod Device

47. Capacitive Voltage Dividers of RF generators: summary of modifications

48. SPIDER, the negative ion source prototype for ITER: first operations with caesium

49. First Operations with Caesium of the Negative Ion Source SPIDER

50. Work Programme 2021 Intermediate Report 3 ITER-RFX-NBTF-A-WP-2021

Catalog

Books, media, physical & digital resources