505 results on '"Wang, Ji-Bo"'
Search Results
2. Permutation flow shop scheduling with makespan objective and truncated learning effects
3. Supply chain scheduling with deteriorating jobs and delivery times
4. Scheduling jobs with general linear deterioration to minimize total weighted number of late jobs
5. A two-agent resource allocation scheduling problem with slack due-date assignment and general deterioration function
6. Single machine scheduling problems with truncated learning effects and exponential past-sequence-dependent delivery times
7. Considering the peak power consumption problem with learning and deterioration effect in flow shop scheduling
8. Research on delivery times scheduling with truncated learning effects
9. Due date assignment single-machine scheduling with delivery times, position-dependent weights and deteriorating jobs
10. Heuristic and exact algorithms for single-machine scheduling problems with general truncated learning effects
11. Research on Multiple Slack Due-Date Assignments Scheduling with Position-Dependent Weights.
12. Study on Single-Machine Common/Slack Due-Window Assignment Scheduling with Delivery Times, Variable Processing Times and Outsourcing.
13. Single-Machine Scheduling with Simultaneous Learning Effects and Delivery Times.
14. Proportionate flow shop scheduling with job-dependent due windows and position-dependent weights
15. Scheduling with Group Technology, Resource Allocation, and Learning Effect Simultaneously
16. Single Machine Scheduling Proportionally Deteriorating Jobs with Ready Times Subject to the Total Weighted Completion Time Minimization
17. Study on proportionate flowshop scheduling with due-date assignment and position-dependent weights
18. Research on single-machine scheduling with position-dependent weights and past-sequence-dependent delivery times
19. Controllable Processing Time Scheduling with Total Weighted Completion Time Objective and Deteriorating Jobs.
20. Phase Conversion Characteristics of Lead Sulfate During the Zinc Oxygen Pressure Leaching Process
21. Effect of Temperature on Oxygen Pressure Leaching of Zinc Sulfide Concentrate
22. Branch-and-Bound and Heuristic Algorithms for Group Scheduling with Due-Date Assignment and Resource Allocation
23. Research on Delivery Times Scheduling with Sum of Logarithm Processing Times-Based Learning Effect.
24. Single machine slack due window assignment and deteriorating jobs.
25. Study on Due-Date Assignment Scheduling with Setup Times and General Truncated Learning Effects.
26. Study on Scheduling Problems with Learning Effects and Past Sequence Delivery Times
27. Controllable Processing Time Scheduling with Total Weighted Completion Time Objective and Deteriorating Jobs
28. Single-Machine Maintenance Activity Scheduling with Convex Resource Constraints and Learning Effects
29. Study on flow shop scheduling with sum-of-logarithm-processing-times-based learning effects
30. Scheduling jobs with general linear deterioration to minimize total weighted number of late jobs
31. Study on Convex Resource Allocation Scheduling with a Time-Dependent Learning Effect
32. Solution algorithms for single-machine scheduling with learning effects and exponential past-sequence-dependent delivery times.
33. Scheduling jobs with simultaneous considerations of controllable processing times and learning effect
34. Research on delivery times scheduling with sum of logarithm processing times based learning effect
35. Two Due-Date Assignment Scheduling with Location-Dependent Weights and a Deteriorating Maintenance Activity
36. Study on due-date assignment scheduling with setup times and general truncated learning effects
37. Delivery Times Scheduling with Deterioration Effects in Due Window Assignment Environments.
38. Resource Allocation Scheduling with Position-Dependent Weights and Generalized Earliness–Tardiness Cost
39. A concise approach for the synthesis of 3-iodoindoles and 3-iodobenzo[b]furans via Ph3P-catalyzed iodocyclization
40. Single-machine scheduling problems with precedence constraints and simple linear deterioration
41. Resource constrained scheduling with general truncated job-dependent learning effect
42. Solid Solute Regularity of La Atom in α-Fe Supercell by First-principles
43. Due-Window Assignment Methods and Scheduling with Generalized Positional-Dependent Weights
44. Scheduling with Resource Allocation, Deteriorating Effect and Group Technology to Minimize Total Completion Time
45. Single machine group scheduling with time dependent processing times and ready times
46. Single machine scheduling with sum-of-logarithm-processing-times based deterioration
47. Single machine group scheduling with decreasing time-dependent processing times subject to release dates
48. Flowshop scheduling with a general exponential learning effect
49. Two-Agent Slack Due-Date Assignment Scheduling with Resource Allocations and Deteriorating Jobs.
50. Study on resource allocation scheduling problem with learning factors and group technology.
Catalog
Books, media, physical & digital resources
Discovery Service for Jio Institute Digital Library
For full access to our library's resources, please sign in.