1,314 results on '"United States. Nuclear Regulatory Commission -- Analysis"'
Search Results
2. Regulatory update: 2024|08|12 - Comment (964) E-mail regarding TerraPower CP EIS Scoping
3. Regulatory update: X-Energy, LLC - Submittal of Project Long Mott Presentation Materials - Geotechnical and Groundwater Modeling Approach Follow-Up
4. Regulatory update: Analysis & Measurement Services Corp., Request for Exemption from NRC Fees
5. Regulatory update: Summary Of The July 15, 2024, Public Outreach To Discuss The NRC 2023 End-Of-Cycle Plant Performance Assessment Of Point Beach Nuclear Plant, Units 1 And 2
6. Regulatory update: 641800 Response to RFAI for Braun Intertec Corporation to License No. 22-16537-05
7. Regulatory update: DG-1420 (RG 1.32 Rev 4) Criteria for Power Systems for Nuclear Power Plants
8. Regulatory update: DG-1354 (RG 1.238 Rev 0) Reg Analysis
9. Regulatory update: DG-1420 (RG 1.32 Rev 4) Reg Analysis
10. Regulatory update: OIG-21-A-05 - Status of Recommendations: Independent Evaluation of the NRC's Implementation of the Federal Information Security Modernization Act of 2014 for Fiscal Year 2020, dated, August 13, 2024
11. Regulatory update: The Use of Environmental Indicators for Impact Assessment in Compliance With the National Environmental Policy Act
12. Regulatory update: William J. Boyle, Ltr re: Model Files For U.S. Department Of Energy Total System Performance Assessment For A Planned High-Level Radioactive Waste Repository At Yucca Mountain, Nevada
13. Regulatory update: Transmittal of TerraPower, LLC, 'Radiological Release Consequences Methodology Topical Report,' NAT-9391 Revision 0
14. Regulatory update: Response To Recommendations From The Office Of The Inspector General Final Evaluation Report: Evaluation Of The U.S. Nuclear Regulatory Commission's Information Technology Asset Management
15. Regulatory update: X-Energy Email regarding withholding determination for 'Xe-100 Topical Report GOTHIC and Flownex Analysis Codes Qualification,' Revision 2 to 008585 (Proprietary) Enclosure 3
16. Regulatory update: Oyster Creek Nuclear Generating Station - June 20, 2024, Clarification Call on Preapplication Readiness Assessment of the Holtec Decommissioning International License Termination Plan
17. Regulatory update: Audit Report Summary For The Review Of Topical Report PWROG-18068-NP, Revision 1, 'Use Of Direct Fracture Toughness For Evaluation Of Reactor Pressure Vessel Integrity' Docket No. 99902037; (EPID L-2021-TOP-0027)
18. Regulatory update: 8|5|24 Notice of Meeting with Holtec International to Discuss technical details of non-mechanistic tipover analysis for proposed submittal for Amend. 19 to the HI-STORM100 storage system to add multipurpose canisters (with continuous basket shim
19. Regulatory update: Pre-Submittal Readiness Assessment Plan for XE-100 'Graphite Structural Analysis And Qualification Methodologies Topical Report'
20. Regulatory update: 06|11|2024 Summary Of The Public Outreach To Discuss The NRC 2023 End-Of-Cycle Plant Performance Assessment Of Quad Cities Nuclear Power Station, Units 1 And 2
21. Regulatory update: GL Report From Purdue University Regarding Transfer of Generally Licensed Source From Gas Chromatograph Onto PU Broad Scope License 13-02812-04
22. Regulatory update: 27Jun2024 Studsvik Pre-Submittal Meeting Open Session Slides
23. Regulatory update: June 12, 2024, Summary Of The Public Outreach To Discuss The NRC 2023 End-Of-Cycle Plant Performance Assessment Of Byron Station, Units 1 And 2
24. Regulatory update: NUREG|BR-0254, Rev. 12, 'Payment Methods'
25. Regulatory update: May 29, 2024, Summary of the Public Outreach to Discuss the NRC 2023 End-Of-Cycle Plant Performance Assessment of Braidwood Station, Units 1 And 2
26. Regulatory update: LER 2023-002-01 for Cooper Nuclear Station, Secondary Containment Differential Pressure Perturbation Exceeds Technical Specifications
27. Regulatory update: VR-SECY-20-0070: Technical Evaluation of the Security Bounding Time Concept for Operating Nuclear Power Plants (Hanson)
28. Regulatory update: Enclosure - NRC feedback regarding Oklo White Paper on Principal Design Criteria
29. Regulatory update: 06|12|2024 Notice of Significant Public Meeting to Discuss NRC End-of-Cycle Performance Assessment of Byron Station, Units 1 and 2 Nuclear Plant for Performance for 2023 Calendar Year
30. Regulatory update: Enclosure: Certificate of Compliance 1015 Amd 10 Request for Additional Information
31. Regulatory update: United States Nuclear Regulatory Commission has submitted (Alpan A ) NUREG|CR-7306, 'Fuel Assembly and Irradiation Parametric Study for Extended-Enrichment and High-Burnup Light-Water Reactor Spent Nuclear Fuel in Dry Storage Casks and Transportation Packages'
32. Regulatory update: United States Nuclear Regulatory Commission has submitted (Steinmeyer P R ) RSA Laboratories Inc.; clarification of model number by email dated April 12, 2024
33. Regulatory update: United States Nuclear Regulatory Commission has submitted ( LINDER F) Responds to IE Bulletin 79-14, 'Seismic Analysis for As-Built Safety-Related Piping Sys.' Insp of steam piping in reactor vessel cavity & alternate core spray piping in reactor vessel head cavity indicate no deviations
34. Regulatory update: United States Nuclear Regulatory Commission has submitted ( MACDONALD C E) Forwards Revision 3 to Certificate of Compliance 5563 for shipping package Models 660C & 660
35. Regulatory update: United States Nuclear Regulatory Commission has submitted ( MCDOWELLBOYER) 'Assessment of Radiation Doses Resulting From Releases of Rn-222 & Ra-226 from U Mining & Milling Activities,' monthly progress rept for Sept 1979
36. Regulatory update: United States Nuclear Regulatory Commission has submitted (MENARD H W ) Provides comments re environ rept on production-scale in situ U mine in Bison Basin,WY.Eventual disposal of evaporites should be further discussed to assure hazardous matl will not be abandoned at site
37. Regulatory update: United States Nuclear Regulatory Commission has submitted (RIVERA J B ) Responds to IE Bulletin 79-19.No low level radwaste generated
38. Regulatory update: United States Nuclear Regulatory Commission has submitted ( JONES G L) Sumbits comments on NUREG-0553.Population density should not be used as criterion for funding priority.Full-time prof should develop & coordinate implementation of crisis relocation
39. Regulatory update: United States Nuclear Regulatory Commission has submitted (MACDONALD C E ) Notification of registration as user of Model CNSI-21-300
40. Regulatory update: United States Nuclear Regulatory Commission has submitted (REID R W ) Forwards rept,'Evaluation of Licensees Responses to IE Bulletins 79-05A & 75-05B.'
41. Regulatory update: United States Nuclear Regulatory Commission has submitted ( ANDERSON T M) Forwards 'Mods to Westinghouse ECCS Evaluation Model for Two Loop Upper Plenum Injection Plants.' Document withheld (ref 10CFR2.790)
42. Regulatory update: United States Nuclear Regulatory Commission has submitted (MACDONALD C E ) Certificate of Compliance 9113,Revision 1,for Model 7-100
43. Regulatory update: United States Nuclear Regulatory Commission has submitted ( MCDONALD C E) Notification of registration as user of Model GE-200
44. Regulatory update: United States Nuclear Regulatory Commission has submitted ( HELMS R E) Requests registration as user of Model 660
45. Regulatory update: United States Nuclear Regulatory Commission has submitted (DAVIS J F ) Forwards Preprint Special Publication 56, 'Geological Evaluation of GE Test Reactor Site,Vallecitos,Alameda County,CA.'
46. Regulatory update: United States Nuclear Regulatory Commission has submitted ( CORDANI R A) Requests registration as user of Models NFP-55,660B,660C, NNFD-SA-2,961A & NNFD-10
47. Regulatory update: United States Nuclear Regulatory Commission has submitted ( HULMAN L G) Discusses plant levee integrity.Levee riprap protection design using questionable analysis techniques.Acceptable Tech Specs ensure periodic insp & immediate remedial action when required
48. Regulatory update: United States Nuclear Regulatory Commission has submitted ( Herbein J G) Responds to 780414 oral request re small break LOCA & loss of offsite power
49. Regulatory update: United States Nuclear Regulatory Commission has submitted (DEVANEY J F ) 'Importance of Preparatory Measures in Disaster Evacuations.'
50. Regulatory update: United States Nuclear Regulatory Commission has submitted (NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR) ) Draft model Tech Specs 2.4,2.4.1-2.4.6 for radwaste mgt & 5.6.2 for nonroutine repts
Catalog
Books, media, physical & digital resources
Discovery Service for Jio Institute Digital Library
For full access to our library's resources, please sign in.