321 results on '"Spross, Johan"'
Search Results
2. Accelerated Weight Histogram Method for Rare Event Simulations
3. Probabilistic time estimation of tunnels constructed with multiple headings
4. Assessment of Climate Impact and Costs Comparing Two Railway Embankment Fill Methods
5. Estimation of small failure probabilities using the Accelerated Weight Histogram method
6. Probabilistic Time Estimation of Tunneling Projects: The Uri Headrace Tunnel
7. Effect of rock joints on lined rock caverns subjected to high internal gas pressure
8. Rock mass response for lined rock caverns subjected to high internal gas pressure
9. Heavy vibratory plate compaction of silty sand: A field study
10. Integrating life-cycle environmental impact and costs into geotechnical design
11. Toward probabilistic ground models for time and cost estimation of tunnel projects
12. Reliability-based design tool for gas storage in lined rock caverns.
13. Influence of spatially varying thickness on load-bearing capacity of shotcrete
14. Principles of Risk-Based Rock Engineering Design
15. Probability distributions of shotcrete parameters for reliability-based analyses of rock tunnel support
16. Reliability-based alarm thresholds for structures analysed with the finite element method
17. Felsbauplanung mit dem geotechnischen Werkzeugkasten von morgen: Perspektiven der Entwicklung der dritten Generation des Eurocodes 2035
18. Felsbauplanung mit dem geotechnischen Werkzeugkasten von morgen: Eurocode 7 – Allgemeine Regeln (EN 1997‐1:2024)
19. Models to Analyze Risk in Time and Cost Estimation of Tunneling Projects
20. Optimal adaptive decision rules in geotechnical construction considering uncertainty
21. Dirichlet Distribution for Tunnel Construction Class Proportions in Probabilistic Time and Cost Estimations
22. Mining Applications for Probabilistic Design
23. Effect of Uncertainty in Design Decisions for Driven Piles in Soil with High Boulder Content
24. Reliability aspects of rock tunnel design with the observational method
25. When is the observational method in geotechnical engineering favourable?
26. On the Need for a Risk-Based Framework in Eurocode 7 to Facilitate Design of Underground Openings in Rock
27. Reliability-based design tool for gas storage in lined rock caverns
28. Observational method as risk management tool : the Hvalfjörður tunnel project, Iceland
29. Implementation of reliability-based thresholds to excavation of shotcrete-supported rock tunnels
30. Mining Applications for Probabilistic Design
31. Dirichlet Distribution for Tunnel Construction Class Proportions in Probabilistic Time and Cost Estimations
32. Data-driven uncertainty reduction in geotechnical engineering: Optimal preloading of a road embankment
33. Geotekniska bedömningsgrunder (GBR) : Ett verktyg för tydligare riskdelning i kontrakt
34. Nytt verktyg hjälper till att strukturera riskerna
35. Limitations Of The Current Approach For Assessmentof Pile Drivability In Soil With High Boulder Content
36. Geoteknik ur ett livscykelperspektiv
37. Beslutsteori i geotekniken : Förstudie
38. Rock engineering design in tomorrow's geotechnical toolbox: Perspectives on the evolution to the 2035 third generation of Eurocode.
39. Rock engineering design in tomorrow's geotechnical toolbox: Eurocode 7 – General Rules (EN 1997‐1:2024).
40. Modelling Construction Performance Variability for Probabilistic Time Estimation of Tunneling Projects
41. Effect of rock joints on lined rock caverns subjected to high internal gas pressure
42. Probabilistic Time Estimation of Tunneling Projects: The Uri Headrace Tunnel
43. Multivariate stability assessment during staged construction
44. Using Observational Method to Manage Safety Aspects of Remedial Grouting of Concrete Dam Foundations
45. Uncertainty, Modeling, and Decision Making in Geotechnics. Edited by Kok-Kwang Phoon, Takayuki Shuku, and Jianye Ching. Boca Raton, FL: CRC Press (an imprint of Taylor & Francis Group), 2024. 502 pp. ISBN: 978-1-032-36749-1 (hbk), ISBN: 978-1-032-36750-7 (pbk), ISBN: 978-1-003-33358-6 (ebk).
46. Risk management procedure to understand and interpret the geotechnical context
47. Riskhantering med observationsmetoden : Praktiska rekommendationer
48. Toward risk-based life cycle assessments in geotechnical design
49. Risk management of cost overrun and delay in underground excavation in rock
50. Praktisk användning av observationsmetoden i ett sannolikhetsbaserat ramverk : Rekommendationer och beräkningsexempel.
Catalog
Books, media, physical & digital resources
Discovery Service for Jio Institute Digital Library
For full access to our library's resources, please sign in.