Search

Your search keyword '"Shinya, Takahiro"' showing total 80 results

Search Constraints

Start Over You searched for: Author "Shinya, Takahiro" Remove constraint Author: "Shinya, Takahiro"
80 results on '"Shinya, Takahiro"'

Search Results

1. ECCD system design activities for JA DEMO.

2. LIPAc RF power system: design and main practical implementation issues

3. Validation of the Linear IFMIF Prototype Accelerator (LIPAc) in Rokkasho

4. Beam diagnostics of an ECR ion source on LIPAc injector for prototype IFMIF beam accelerator

6. Linear IFMIF Prototype Accelerator (LIPAc): Installation activities for Phase-B beam commissioning in Rokkasho

7. Status of the RFQ linac installation and conditioning of the Linear IFMIF Prototype Accelerator

15. EFL Motivating Factors in Japanese Non-English / Intercultural Studies University Majors: A Mixed-Methods Approach

16. Identification of Waves by RF Magnetic Probes during Lower Hybrid Wave Injection Experiments on the TST-2 Spherical Tokamak

17. Development of a Low Reflection Dummy Load for Calorimetric Power Measurements in High-Power Millimeter Wave Systems

18. Radiation Measurement in the 1st Beam Commissioning Campaign of the LIPAc RFQ

19. Progress on performance tests of ITER gyrotrons and design of dual-frequency gyrotrons for ITER staged operation plan

20. Neutron production measurement in the 125 mA 5 MeV deuteron beam commissioning of Linear IFMIF Prototype Accelerator (LIPAc) RFQ

21. Functional Overview of the RF Power System for the LIPAc RFQ

22. Fully non-inductive plasma start-up with lower-hybrid waves using the outboard-launch and top-launch antennas on the TST-2 spherical tokamak

23. English in Japan: Motivating Factors in University EFL/ESL Students and Their Attitudes Towards Lifelong English Language Learning

24. IFMIF/EVEDA RFQ beam commissioning at nominal 125 mA deuteron beam in pulsed mode

25. Integration of 175 MHz LIPAc RF system and RFQ Linac for Beam Commissioning

26. A simulation environment to simulate lower-hybrid-wave-driven plasmas efficiently

27. IFMIF原型加速器におけるRFシステムの調整試験及びRFQによる重陽子ビーム加速試験

28. IFMIF/EVEDA原型加速器(LIPAc)のRFQビームコミッショニングの進展

29. Improvement in reliability of RF system of Linear IFMIF Prototype Accelerator (LIPAc)

30. Validation of the Linear IFMIF Prototype Accelerator (LIPAc) in Rokkasho

31. Progress of 175 MHz RF system onthe Linear IFMIF Prototype Accelerator

32. Integration of 175 MHz LIPAc RF system and RFQ Linac for Beam Commissioning

33. IFMIF原型加速器の進展と核融合中性子源A-FNS計画

34. Beam Commissioning of Beam Position and Phase Monitors for LIPAc

35. IFMIF/EVEDA RFQ Preliminary Beam Characterization

36. Progress Report on LIPAC

37. IFMIF原型加速器の現状

38. Commissioning Status of Linear IFMIF Prototype Accelerator (LIPAc)

39. Beam Commissioning of the IFMIF EVEDA Very High Power RFQ

40. Commissioning of the Lipac Medium Energy Beam Transport Line

41. Current Drive Experiment Using Top/Outboard Side Lower Hybrid Wave Injection on TST-2 Spherical Tokamak

42. Installation and Low Power Test of IFMIF-EVEDA RFQ at Rokkasho Site

43. Status of IFMIF-EVEDA RFQ

44. Intermediate Commissioning Results of the Required 140 mA/100 keV CW D⁺ ECR Injector of LIPAc, IFMIF's Prototype

47. RF Central Solenoid Operation for Plasma Production and Current Drive in TST-2

48. First Measurement of Electron Temperature and Density Profiles for Spherical Tokamak Plasmas Sustained by Lower Hybrid Waves

50. Identification of Waves by RF Magnetic Probes during Lower Hybrid Wave Injection Experiments on the TST-2 Spherical Tokamak

Catalog

Books, media, physical & digital resources