Search

Your search keyword '"Rapid construction"' showing total 540 results

Search Constraints

Start Over You searched for: Descriptor "Rapid construction" Remove constraint Descriptor: "Rapid construction"
540 results on '"Rapid construction"'

Search Results

1. Research and application of rapid reconstruction technology to existing bridge guardrails based on UHPC connection.

2. 下穿城区隧道先下后上法控制爆破快速施工技术.

3. Research Progress on Shear Characteristics and Rapid Post-Disaster Construction of Narrow-Width Steel Box–UHPC Composite Beams.

4. Research and application of rapid reconstruction technology to existing bridge guardrails based on UHPC connection

5. Application and Research of a Steel Reinforcement Hook Robot in Production Process of High-tower Steel Reinforcement Parts.

6. Application of 'Lean Construction' Management in Large Group Housing Project

7. 城市公共厕所适应性设计探索 ——以深圳坪山区公共厕所竞赛为例.

8. 复杂条件下地铁车站出入口快速施工及 风险控制技术研究.

9. Experimental and Numerical Analysis of a Temporary Bridge Connector Consisting of an Upper Bearing Block–Lower Pin Configuration.

10. Research on key technologies for the construction of integrated support system of disc buckle formwork frame and overhang protection.

11. 多学科配合下的装配式负碳住宅快速建造实践——以 2021 迪拜国际太阳能十项全能竞赛作品 “X-HOUSE” 为例.

12. New Connection Between Precast Abutment Wall and CIP Foundation Suitable for Accelerated Bridge Construction

13. Design of Steel Intensive Quarantine Centre

14. Research Progress on Shear Characteristics and Rapid Post-Disaster Construction of Narrow-Width Steel Box–UHPC Composite Beams

15. Experimental and Numerical Analysis of a Temporary Bridge Connector Consisting of an Upper Bearing Block–Lower Pin Configuration

16. 高原铁路隧道岩爆施工技术研究.

17. Heat Transfer Analysis of Warm Guss Asphalt Concrete for Mini-Trench Overlaying.

18. Design and Experimental Validation of a Rapidly Deployable Folding Floating Bridge Based on Rigid-Flexible Combination.

19. Spray water cooling of newly laid asphalt pavement for rapid opening to traffic.

20. Application and Research of a Steel Reinforcement Hook Robot in Production Process of High-tower Steel Reinforcement Parts.

21. Accelerated Community Resettlement by the Means of Robotic 3D-Printing from Conflicted Highway Projects: A Case Study of Yaounde, Cameroon

22. Rapid construction of infectious clones for distinct Newcastle disease virus genotypes

23. A Multi-Segment Expanded Anchor for Landslide Emergency Management.

24. 思、学、做 — 2022 中国国际太阳能十项全能竞赛综述.

25. Determining the allowable opening-to-traffic asphalt temperature for airport pavements.

26. Design and Experimental Validation of a Rapidly Deployable Folding Floating Bridge Based on Rigid-Flexible Combination

27. Heat Transfer Analysis of Warm Guss Asphalt Concrete for Mini-Trench Overlaying

28. 预制装配式电缆排管地基局部加固方法.

29. Sustainable Development of the Concrete Technology and Concreting at the VNIIG IM. B. E. VEDENEEVA.

31. 沉管隧道与人工岛技术发展及展望.

32. A Multi-Segment Expanded Anchor for Landslide Emergency Management

33. 硫铝酸盐水泥对快速施工海工混凝土性能的影响.

34. Experimental study on the performance of the UHPC longitudinal joint between existing bridge decks and lateral extensions.

35. Development of rapid construction technology for liquified natural gas storage tanks using precast concrete panels as a permanent form.

36. Precast system and assembly connection of cement concrete slabs for road pavement: A review

37. Experimental study on asynchronous construction for composite bridges with corrugated steel webs.

38. Facile construction of Fe@ zeolite imidazolate Framework-67 to selectively remove uranyl ions from aqueous solution.

39. Modeling system for the rapid construction in Syria

40. Monotonic and fatigue behavior of steel-concrete composite beams subjected to corrosion

41. 3D City Online Visualization and Cluster Architecture for Digital City

42. Introduction of the Intermeshed Steel Connection—A New Universal Steel Connection

43. Experimental study on flexural strengthening of reinforced concrete beams with U-shaped steel under secondary load

44. Design and Mechanical Properties of Steel-UHPC Lightweight Composite Decks

45. Construction Technology of Micro Bench Cut Method for Weak Rock Tunnel with High In-situ Stress

46. The Undrained Characteristics of Tengger Desert Sand from True Triaxial Testing

47. Multi-method geoarchaeological analyses demonstrates exceptionally rapid construction of Ridge West 3 at Poverty Point

48. Temporary Shear Brace Design Method for Steel Box Girder Viaduct in Transverse Block Construction.

49. 岩爆隧道柔性支护快速施工技术.

50. Rapid construction of superhydrophobic fabric coating assisted with ‘Tyndall Effect’

Catalog

Books, media, physical & digital resources