Search

Your search keyword '"Railroads -- Analysis"' showing total 643 results

Search Constraints

Start Over You searched for: Descriptor "Railroads -- Analysis" Remove constraint Descriptor: "Railroads -- Analysis"
643 results on '"Railroads -- Analysis"'

Search Results

1. Propagation-Based Train Rescheduling under Recoverable Delay Disturbances

3. STB ISSUES FINAL SCOPE OF STUDY FOR GREEN EAGLE RAILROAD ENVIRONMENTAL IMPACT STATEMENT

4. Train trips with season ticket reach record low. NEWS BULLETIN

5. A Rescheduling Approach for Freight Railway considering Equity and Efficiency by an Integrated Genetic Algorithm

6. Railway Technical Research Institute Researchers Have Provided New Data on Algorithms (Development of a faster algorithm for extracting contact position from instrumented wheelset based on frequency analysis and its implementation in online ...)

7. 3rd Party Sampling Agency For Loading End And Unloading End Engagement Of Third Party Sampling Agency For Collection, Preparation And Chemical Analysis Of Coal At Loading End Captive Mine Head Or Railway Siding Of Wbpdcl And Unloading End Power Plan

9. Supply Of Making Of Culvert Crossing Model, Making Of Metal Road Crossing Model, Making Of Power Line Crossing Model, Making Of Foot Path Crossing Model, Making Of Overhead Crossing Model, Making Of River Crossing Model, Making Of Railway Crossing Model

10. Surveillance Assessment Of Indian Railway E-procurement System (ireps) Version V7.10

11. China achieves breakthrough in high-speed railway data analysis

12. CHINA ACHIEVES BREAKTHROUGH IN HIGH-SPEED RAILWAY DATA ANALYSIS

13. China achieves breakthrough in high-speed railway data analysis

14. Factors Affecting Evaluation of Railway Bulk Freight Rate: A Novel Cloud Theory-Based Approach

15. Impact Assessment of Interlocking Systems on Single-Track Railway Lines as a Measure Leading to Resilient Railway System

17. Researchers at Nanjing University of Information Science and Technology (NUIST) Target Information Technology (Improvement of Cloud Microphysical Parameterization and Its Advantages In Simulating Precipitation Along the Sichuan-xizang Railway)

18. Italian Institute of Technology Researcher Highlights Research in Bioengineering (Dynamic and Static Assistive Strategies for a Tailored Occupational Back-Support Exoskeleton: Assessment on Real Tasks Carried Out by Railway Workers)

19. Data on Information Technology Reported by Researchers at Northeastern University (A Data-driven Surrogate Modeling for Train Rescheduling In High-speed Railway Networks Under Wind-caused Speed Restrictions)

21. Supply Of Procurement Of Detc - Solenoid Valve And Spares Make Rotex Rotex Make Set Of Magnet Valve Model No 3028-10-iii-110v-dc-28 Warrantyperiod: 30 Months After The Date Of Delivery rotex Make Set Of Magnet Valve Model No 3038-10-iii-110v-dc-2

22. D Check Of Cummins Engine Model- Nta 855r Of Detc-190001 Machine

23. Overhauling and Repairing of Air compressor (Make-Kirloskar, Model-2HA2TERST) OF Deshaling Plant and Air compressor of Clean coal side for Railway Siding at Sawang Washery

24. Maintenance Of Green Area Between Railway Line And G.t.k. Road(ismile Khan Wala Bagh). Maintenance Of Park And Old Orchard At Model Town To Rajpura Cantt (rattan Wala Bagh). Day To Day Cleaning And Annual Maintenance Of 02 Nos. Public Toilets

26. D Check Of Cummins Engine Model- Nta 855r Of Detc-190002 Machine

28. Collection And Preparation Of Samples And Its Chemical And Size Analysis, Quality Monitoring And Loading Supervision At Sanu Limestone Mines And Sonu Railway Siding

29. Collection And Preparation Of Samples And Its Analysis For Chemical Size, Quality Monitoring Loading Supervision From Sanu Limestone Mines And Sonu Railway Siding

31. An Experimental Analysis of Hierarchical Rail Traffic and Train Control in a Stochastic Environment

32. Low rail grinding template evaluation: A closer look at the low rail on curved track

33. Advanced Transition Preemption Strategy for Signalized Intersections near Highway-Rail Grade Crossings with Dual Tracks

37. Mike Amesbury ask the Secretary of State for Transport, if he will make an assessment of the (a) adequacy of the condition of the Mid Cheshire Railway line and (b) potential merits of increasing the speed of trains on the line

39. Supply Of Rotex Magnet Valve 3 Way Nc 10 Type With Manifold Model 3038c, Rotex Drg. No. 081-055-02-cworking Pressure Of Air 2-10 Kg|cm2, Coil Size Iii Railway Stud Type 110 Volt Dc, 3|8 Inch Bsp (f) Thread Pipeconnection With Manual Actuator, Body Materia

40. Folksong and Ballad as Social Comment in some South African Railway Poems and Songs

41. Southwest Jiaotong University Researcher Details Research in Applied Sciences (Aerodynamic Analysis of the Opening Hood Structures at Exits of High-Speed Railway Tunnels)

42. Multiscenario-Based Train Headway Analysis under Virtual Coupling System

43. Evaluation of Alternative Bridge Ties, Hardware: Comparing Douglas fir and yellow pine timber ties with FFU ties for the long term

44. Route Selection of Multimodal Transport Based on China Railway Transportation

45. Supply Of Submersible Booster Pump Set Wit Motor. Make Ksb Pump Model No. Bph 333|8 And Motormodel No. Hbc -523 , Rating 38 Kw|52 Hp, Head 93 Mtrs, Discharge 86 Mtr Cube|Hr, Nominal Speed- 2900rpm , Shut Off Head -153.22 Mtr, Chrome Steel Impeller As Re

47. Supply of Projector Lamp With Housing And Chip (Projector Make-Panasonic, Model- Ptd5700) Warrantyperiod: 12 Months After The Date Of Delivery Projector Lamp With Housing And Chip (Projector Make- Panasonic, Model- Ptdw530e) Warranty Period: 12 Months

50. Supply Of Projector Lamp With Housing And Chip (projector Make-panasonic, Model- Ptd5700) Warrantyperiod: 12 Months After The Date Of Delivery projector Lamp With Housing And Chip (projector Make- Panasonic, Model- Ptdw530e) warranty Period: 12 Months

Catalog

Books, media, physical & digital resources