212 results on '"Purchasing departments -- Surveys"'
Search Results
2. Consulting Services For Group Structure Analysis, Ilomants Municipality
3. Granite School District - Purchasing Department Vendor Survey
4. Granite School District - Purchasing Department Vendor Survey
5. Framework Agreement For Carrying Out Topographical Surveys As Part Of Drinking Water Works On The Sierc Territory
6. Procurement profession capability
7. Execution Of Design And Survey Works On The Object: 'overhaul Of The Main Building Of The Regional Hospital No. 4' (ishim) At The Address: Tyumen Region, S. Armizonskoe, St. Dzerzhinsky, 33
8. Providing Services For Conducting Engineering Surveys For The Preparation Of Design Documentation For Clearing The Reservoir Section(s) On The River. Funnel In The Tula Region
9. Execution Of Design And Survey Works On The Object 'construction Of A Tram Line Along Dzerzhinsky Street From The Railway Station To Gagarin Street'
10. Execution Of Works On Design, Engineering Surveys, Construction And Commissioning Of The Capital Construction Facility 'reconstruction Of Sewage Treatment Facilities In The City Of Tula, Including Stage I In Terms Of The Construction Of A Mechanical Sludg
11. Engineering Surveys, Development Of Design And Working Documentation: 'construction Of A Motor Road From The Interchange At The Intersection Of The Bypass Of The Village Of Ozhogino With The Federal Highway P-254 Irtysh. Access To Tyumen To The Second Tra
12. Execution Of Design And Survey Works On The Object: production Of Design Estimates For The Construction Of Water Supply Networks To Land Plots X. Pervomaisky St. Komsomolskaya (5 Land Plots)'
13. Execution Of Design And Survey Works On The Object: production Of Design Estimates For The Construction Of Water Supply Networks To Land Plots In Armavir, The Settlement Of The Central Estate Of The Yubileiny State Farm, St. Molodyozhnaya, 2a, 2b, 2v, St
14. Execution Of Design And Survey Works On The Object: production Of Design Estimates For The Construction Of Water Supply Networks To Land Plots In Armavir, The Village Of Staraya Stanitsa: St. Green, 45|28, 45|26, 45|18, St. Lugovaya, 37, 39, 46, 48, 50
15. Execution Of Design And Survey Works On The Object: production Of Design Estimates For The Construction Of Water Supply Networks To Land Plots In The City Of Armavir, Pos. East, St. Lesnaya (77 Land Plots)'
16. Execution Of Design And Survey Works On The Object: 'production Of Design And Estimate Documentation For The Construction Of Water Supply Networks To Land Plots Of Zavetny Settlement, 9th Zagorsky Ave., 2-10, 12-25, 37, 39, 41, 45, 47, 49, 51 (56 Land Plo
17. Execution Of Design And Survey Works On The Object: 'production Of Design And Estimate Documentation For The Construction Of Water Supply Networks To Land Plots In Armavir, Zavetny Settlement, Atamanskaya St., 1,3,5, Officerskaya St., 23,25,29, St. Raspbe
18. Execution Of Design And Survey Works On The Object: 'production Of Design And Estimate Documentation For The Construction Of Water Supply Networks To Land Plots Of Zavetny Settlement, Lenina St., 54, 74, 78, 80, 86, 88, 90, 92, 98, 110, 110 , 112, 114, 12
19. Execution Of Design And Survey Works On The Object: 'production Of Design Estimates For The Construction Of Water Supply Networks To Land Plots In Armavir, Zavetny Settlement, Naberezhny Boulevard, 7,9,11,13,15'
20. Execution Of Design And Survey Works On The Object: Preparation Of Design Estimates For The Construction Of Water Supply Networks To The Land Plots Of Armavir, Kh. Krasnaya Polyana St. Budyonny (69 Land Plots)
21. Performance Of Design And Survey Works On The Object: 'production Of Design And Estimate Documentation For The Construction Of Water Supply Networks To Land Plots Of Krasin, Lesnaya St., 10, 10a'
22. Development Of Design And Estimate Documentation At The Facility: 'construction Of A Regulatory Hydraulic Structure On The Telyachiy Kut Erik Of The Limansky District Of The Astrakhan Region, Including Design And Survey Work'
23. Performance Of Design And Survey Works On The Object: 'strengthening The Slopes Of The Trinity Cape Of Tobolsk'
24. Execution Of Design And Survey Works On The Object: 'overhaul Of The Highway K.f. Vatolina St., Novy Urengoy'
25. Execution Of Design And Survey Works On The Object: provision Of Transport And Engineering Infrastructure Of Microdistrict. Zaozerny, Novy Urengoy
26. Asbestos Surveying, Sampling, Analysis & Monitoring Service
27. Asbestos Surveying, Sampling, Analysis & Monitoring Service
28. Provision For Drainage Survey Camera
29. Implementation Of A Pan-merseyside Representative Household Survey On Violence
30. Globality's 2023 Research Uncovers Eye-Opening Opportunities for CFOs of Global 2000 Companies to Cut Costs Amid Fear of Recession
31. 23-99119e Implementation Of Design And Survey Work Of 1 And 2 Stages For The Facility: 'construction Of Coastal Structures Within The Borders From Sverdlovskiy Prospekt To The University Embankment In The Kalinin And Central Districts Of Chelyabinsk (5 St
32. 22110 Mobile Coverage Surveys For Connecting Cambridgeshire
33. 22-98502e Implementation Of Design And Survey Work On The Facility: 'reconstruction Of The Road On The Line Of Linear From Lenin Ave. To Samokhin St.' '
34. The Implementation Of Design And Survey Work On The Facility: The Overhaul Of The Building Of The Clinic Of The Yurginsky District Hospital And The Clinic Of The Gbuz To 'regional Hospital No. 11' (r.p. Golyshmanovo) At The Address: Tyumen Region, Yurgins
35. Performance Of Design And Survey Work On The Facility: Overhaul Of The Building Of The Malyshenshensky Outpatient Clinic Gbuz To 'regional Hospital No. 11' (r.p. Golyshmanovo) At The Address: Tyumen Region, Golyshmanovsky District, P. Malyshendka, 50 Year
36. Preparation Of Design Documentation And The Implementation Of Engineering Surveys For The Facility: Major Repairs Of The Infectious Diseases Department Of The Gbuz To 'regional Hospital No. 20', Located At The Address: Tyumen Region, P. Uvat, St. Belkin
37. New American City & County survey identifies biggest problems facing public procurement departments in pandemic
38. Drainage Survey Camera
39. Survey: Inflation the Number One Issue on the Minds of Procurement Professionals
40. Provision Of Quantity Surveying Services For Whitehouse Community Meeting Place. Further Competition Under Professional Services Framework Lot 2 Band C - Award
41. Satisfaction Survey For South Tyneside Homes
42. Provision Of The Annual Travel|traffic Survey
43. Im - Enterprise-level Secure Survey Tool
44. Procurement Professionals Prefer Hybrid Workplace, Reveals Beroe Survey
45. Procurement Professionals Prefer Hybrid Workplace, Reveals Beroe Survey
46. Provision Of Surveying Services
47. Majority of procurement professionals plan to continue working remotely at least part time through 2021, finds Bonfire survey
48. Public Perception|Engagement Surveys
49. Sourcing maturity: finding the path to sourcing and PLM integration excellence
50. M15488 Requirement Of Survey Prism Target For Surveying
Catalog
Books, media, physical & digital resources
Discovery Service for Jio Institute Digital Library
For full access to our library's resources, please sign in.