1. Draft environmental impact statement for the Defense Logistics Agency's fuel pier relocation project to Terminal Island Naval Complex, Long Beach California
- Author
-
United States. Defense Logistics Agency; Port of Los Angeles; Port of Long Beach; United States. Coast Guard; United States. Army. Corps of Engineers; U.S. Fish and Wildlife Service; Atlantis Scientific (Firm) and United States. Defense Logistics Agency; Port of Los Angeles; Port of Long Beach; United States. Coast Guard; United States. Army. Corps of Engineers; U.S. Fish and Wildlife Service; Atlantis Scientific (Firm)
- Abstract
I I I I I I I I I I I I I I I I I I ) (cO~J~ DRAFT DFSP FUEL PIER RELOCATION I I I I I I I I I I I I I I I I I I I DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR THE DEFENSE LOGISTICS AGRNCY' S FUEL PIER RELOCATION PROJECT TO TERMINAL ISLAND NAVAL COMPLEX LONG BEACH, CALIFORNIA This Environmental Statement (ES) addreQses the euvironmental impacts resulting from the-construction and operation of the proposed Defense Logist!c9 Agency's (DLA) Fuel Pier Relocation Project. The report addresses both the proposed fuel terminal and the proposed pipeline routes in accord with all laws, r ules and regulations applicable to this project. Responsible Agency: Send Comments To: Defense Logistics Agency Defense Fuel Supply center Cameron Station Alexandria, VA 22314 Mr. Chuck Williams {DFSC-AE) Etwironmenta1 Tmpact Officer Defense Fuel Supply Center Cameron Station Alexandria, VA 22314 (202] 274-6989 Cooperating Agencies: Port of Los Angeles Port of Long Beach U.S. Coast Guard U.S. Army Corps of Engineers U.S. Fish and Wildlife Servi ce Cohtract Number: N62475-B0-9691 Prepared By: Atlantis Scientific Post Office Box 10777 Beverly Hills, California 90213 PROJECT VICINITY: PORTS OF LOS ANGELES AND LONG BEACH SOURCE: PORT OF LONG BEACH 11 I I I I ;I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I TABLE OF CONTENTS Report Section I • 0 INTRODUCTION 1.1 Overview 1. 2 Orientaticn to NEPA l. 3 :Report Structure 2 .o 2, l 2. 2 2 .3 2.4 2. S 2. 6 2, 6. 1 2,6,1.1 2.6.1.l.l 2,6,l.l.2 2.6.1.2 2.6.1.3 2. 6. 2 2 .6.2 .1 2. 6 .2. 2 2, 6 .3 2 ,6, 3 ,l 2 .6. 3. 2 SUMMARY Statement Status Name and Status of Act icn Project Loc.ation construction of the Fuel Pier Construction of Pipeline sys.tern E:nvironmehtal Impact/Mit igation Marine Elements Wa·ter Quality 'l'erminal l?ipeline Oil Spill Contingenc y Marine Traffi c Safety/Risk Manaqement 1'erminal Pipeline SuJ:"face Elements Geology Traffic i ii 1-1 1-1 1-2 l-2 2-1 2-1 2-1 2-1 2-6 2-6 2-6 2-6 2-6 2-6 2-7 2-7 2-8 2-8 2-8 2-9 2-10 2-10 2-10 I
- Published
- 1982