164 results on '"Osanloo M"'
Search Results
2. Anticancer Activity of Chitosan Nanoparticles Containing Satureja khuzistanica Essential Oil, and Carvacrol against Human Melanoma and Breast Cancer
3. A Spatiotemporal Environmental Sustainability Assessment Model for Deep and Large-scale Open-pit Copper Mines.
4. Semi-symmetrical production scheduling of an orebody for optimizing the depth of transitioning from open pit to block caving
5. Sustainability Assessment of Angouran Lead and Zinc Mining Complex
6. How to Exit Conveyor from an Open-Pit Mine: A Theoretical Approach
7. A New Comprehensive Model for Integrating Environmental, Economic, and Social Performance of Deep and Large-scale Open-Pit Copper Mines.
8. A new approach to mining method selection based on modifying the Nicholas technique
9. Prediction of the blastability designation of rock masses using fuzzy sets
10. Adverse effects of coal mine waste dumps on the environment and their management
11. Incorporating environmental issues into optimum cut-off grades modeling at porphyry copper deposits
12. Achieving to some outranking relationships between post mining land uses through mined land suitability analysis
13. An environmental oriented model for optimum cut-off grades in open pit mining projects to minimize acid mine drainage
14. Prediction of Shovel Productivity in the Gol-e-Gohar Iron Mine
15. Biodesulfurization of the Tabas deposit coal by microorganisms
16. Methods for Calculation of Optimal Cutoff Grades in Complex Ore Deposits
17. Factors Affecting the Selection of Site for Arrangement of Pit Rock-Dumps
18. An updated and modified O’Hara cost estimating model based on World and Iran economic conditions
19. A decision making model for lignite deposits exploitability
20. Application of genetic algorithm to optimize the number and size of equipment of surface mine
21. Oxidation pretreatment for enhancing desulfurization of coal with sodium butoxide
22. Desulfurization of Tabas coal with microwave irradiation/peroxyacetic acid washing at 25, 55 and 85 °C
23. A Set of Classified Integer Programming (IP) Models for Optimum Transition from Open Pit to Underground Mining Methods
24. A Set of Classified Integer Programming (IP) Models for Optimum Transition from Open Pit to Underground Mining Methods.
25. Optimizing mine production scheduling for multiple destinations of ore blocks
26. Determination of value at risk for long-term production planning in open pit mines in the presence of price uncertainty
27. Optimum cut-off grade’s calculation in open pit mines with regard to reducing the undesirable environmental impacts
28. A stochastic simulation framework for truck and shovel selection and sizing in open pit mines
29. Open-pit slope design under geomechanical uncertainty using Monte Carlo-based analysis.
30. Investigating the effect of different block dimensions on the economic life of open pit mines.
31. Seismic wave monitoring and ground vibration analysis for bench blasting in Sungun open-pit copper mine.
32. Flyrock prediction by multiple regression analysis in Esfordi phosphate mine of Iran.
33. Ultimate pit limit of iron ore mines using maximum flow algorithms.
34. A non-linear programming model for open-pit mine equipment selection.
35. New approach for selection of waste dump sites in open pit mines.
36. Studying the scale effect and uniformity of grade parameter using geostatistical approaches
37. Optimisation of road position in open pit mining using location theory
38. Using chance-constrained binary integer programming in optimising long- term production scheduling for open-pit mine design.
39. Optimising the loading system of Gol-e-Gohar iron ore mine of Iran by genetic algorithm.
40. Uncertainty-based push-back design algorithm in open pit mining.
41. ODM: a new approach for open pit mine blasting evaluation
42. A new classification system for evaluating rock penetrability
43. Application of Lerchs and Grossmann algorithm to design final pit limits of Sarcheshmeh copper mine of Iran.
44. The effects of open-pit blastholes physical parameters on overbreak.
45. New approach for selection of waste dump sites in open pit mines
46. Long-term open pit mine production planning: a review of models and algorithms
47. Using chance constrained binary integer programming in optimising long term production scheduling for open pit mine design
48. The possibility of using semi-dispatching systems in Sarcheshmeh copper mine of Iran.
49. Estimation of the Sungun copper deposit of Iran by means of inverse distance weighting method.
50. Using a Combination of Genetic Algorithm and the Grid Search Method to Determine Optimum Cutoff Grades of Multiple Metal Deposits
Catalog
Books, media, physical & digital resources
Discovery Service for Jio Institute Digital Library
For full access to our library's resources, please sign in.