Search

Your search keyword '"Ljubojev, Milenko"' showing total 111 results

Search Constraints

Start Over You searched for: Author "Ljubojev, Milenko" Remove constraint Author: "Ljubojev, Milenko"
111 results on '"Ljubojev, Milenko"'

Search Results

1. Filter rules for soil and geosynthetics

2. Software solution for the mine subsidence prediction based on the stochastic method integrated with the GIS

3. Stochastic model and GIS spatial analysis of the coal mine subsidence

4. Selection of the optimum pushbacks in a long-term planning process of the open pit: A condition for maximization the net present value: Case study: The open pit Veliki Krivelj, Serbia

5. Analysis the profitability of the copper ore exploitation on the Cerovo Primarno-Drenova deposit for the capacities of flotation ore processing of 6.0 and 12.0 million tons annually

6. Possibility of use the Kaona quartzite (East Serbia)

7. Importance of planning the open pits in the conditions of contemporary mining: A case study: The open pit South mining district Majdanpek

8. An analysis the effects of changes in price of metal and operating costs to the profit in exploitation the copper ore deposits, a case study: Copper mine Majdanpek, Serbia

9. Landfill stability analysis at the open pit 'Gacko', Bosnia and Herzegovina - Republic of Srpska

10. Change the uniaxial compressive strength of paste backfill depending on change the parameters

11. Waste flue gas desulphurization in coal combustion from Ugljevik by the wet process

12. The effect of different collectors on the quality of basic copper concentrate of the ore body Tenka

13. Analysis and relationship of safety coefficient (Fs) and critical factor of influence the stress reduction (SRF) in the case of external waste dump of the east waste dump - profile III-III open pit 'Gacko' Gacko

14. Forecast the behaviour of rock mass before taking up the excavation at deeper layers of the ore body Borska reka

15. Analysis the long-term development of the open pit North Mining District Majdanpek for the capacity of 5x106 tons of ore annually

16. Analysis the possibility of increasing capacity of copper ore mining at the open pit South Mining District Majdanpek at 11x106 tons annually

17. Basic requirements of backfilling with flotation tailings in the Bor River underground mine

18. The use of script in the software Gemcom

19. Stress and strain analysis in the rock massif during coal exploitation with large diameter boreholes in east field pit RMU Bogovina

20. Testing the carrying capacity of anchor in the ore body 'T1'

21. Determining the stress of rock massif

22. Modeling of rock massif in the Jama Bor with special focus on the previous explorations of the ore body 'Borska Reka'

23. Effect of stage development of mining operations on maximization the net present value in long-term planning of open pits

24. Dynamic pressure of soil on a supporting wall in its displacement

25. Side pressure of soil on a supporting wall at the effect of dynamic load on the surface

26. Finite element analysis of deep underground salt caverns

27. Deformability parameters for forming the stress-strain state models of rock massif

28. Estimation of soil compaction parameters based on the Atterberg limits

29. Effect of displacement the flotation Dam 2 on the route of future collector of the Krivelj river, tested using the software Phase 2 v8.0

30. Software solution for the mine subsidence prediction based on the stochastic method integrated with the gis

32. Dynamic pressure of soil on a supporting wall in its displacement

33. Side pressure of soil on a supporting wall at the effect of dynamic load on the surface

34. Model za optimizaciju graničnog saržaja metala u rudi u funkciji dugoročnog planiranja površinskih kopova

35. The effect of different collectors on the quality of basic copper concentrate of the ore body Tenka

38. Development of dynamic phenomena in the rock mass

41. Estimation of soil compaction parameters based on the Atterberg limits

42. Analysis of foundation settlement from progressive moistening of silty clay

43. Triaxial CD test on the flotation tailing dump sample from the dam 3A

44. Analysis the spatial position of mining facilities of the Veliki Krivelj mine to the proposed tunnel route for relocation the Krivelj river

45. Proposal of cross section for the Krivelj River tunnel

46. Residual parameters of shear strength the high plasticity clay and silt from the open-pit mine 'Tamnava-West field'

47. Rock mass classification before the tunnel construction: per Wickham and Bienawski

48. Physical and mechanical properties of anchor mixture applied in the ore body 'T'

49. Possibility of use the crushed aggregate, grain-size 0/31.5 mn, from the site 'Zagrađe-Open Pit5' for preparation the access roads to the new route of the Krivelj collector

50. Preparations for investigation the tunnel axis and field surveying

Catalog

Books, media, physical & digital resources