70 results on '"Laxdal, R.E."'
Search Results
2. Rotating proton beam for higher RIB releases
3. Cold tests of HOM absorber material for the ARIEL eLINAC at TRIUMF
4. Magnetic field studies in the ISAC-II cryomodule
5. ISAC-II QWR cavity characterizations and investigations
6. Recent progress in the superconducting RF Program at TRIUMF/ISAC
7. Alignment of the ISAC-II Medium Beta Cryomodule with a Wire Monitoring System
8. First Cold Test of the ISAC-II Medium Beta Cryomodule
9. Status of the ISAC-II Cryogenic System
10. Acceleration of radioactive ions
11. Microphonics Suppression In Ariel Acm1 Cry- Omodule
12. Manipulation of the micro and macro-structure of beams extracted from cyclotrons
13. ARIEL e-LINAC: Commissioning and Development
14. Design and development of injector cryomodule for superconducting electron linac
15. A non-intercepting beam current monitor for the ISAC-II SC-linac
16. Commissioning and early experiments with ISAC-II
17. The Production and Acceleration of RIBs at ISAC-I and Future Plans for ISAC-II.
18. Chapter 219 - Alignment of the ISAC-II Medium Beta Cryomodule with a Wire Monitoring System
19. Chapter 24 - Status of the ISAC-II Cryogenic System
20. Chapter 16 - First Cold Test of the ISAC-II Medium Beta Cryomodule
21. Beam quality and operational experience with the superconducting LINAC at the ISAC II rib facility.
22. Cryogenic, Magnetic and RF Performance of the ISAC-II Medium Beta Cryomodule at Triumf.
23. Status of the ISAC-II Accelerator at Triumf.
24. First Acceleration with Superconducting RF Cavities at ISAC-II.
25. TRIUMF injection line nonintercepting beam energy monitoring through phase measurement.
26. Beam commissioning and first operation of the ISAC DTL at TRIUMF
27. Using a pulsed deflector for extraction of pulsed beams from the TRIUMF cyclotron
28. Beam dynamics studies on the ISAC RFQ at TRIUMF
29. Use of the LANA code for the design of a heavy ion linac
30. RF measurement summary of ISAC DLT tanks and DTL bunchers
31. The TRIUMF facility and cyclotron developments
32. Progress in the conceptual design of the ISAC-II linac at TRIUMF
33. A separated function drift-tube linac for the ISAC project at TRIUMF
34. A triple gap resonator design for the separated function DTL at TRIUMF
35. Status of the TRIUMP-ISAC facility for accelerating radioactive beams
36. Completion and operations of ISAC-I and extension to ISAC-II
37. A mechanical tuner for the ISAC-II quarter wave superconducting cavities.
38. The ISAC-II upgrade at TRIUMF - progress and developments.
39. Beam commissioning and first operation of the ISAC DTL at TRIUMF.
40. Progress in the conceptual design of the ISAC-II linac at TRIUMF.
41. The TRIUMF facility and cyclotron developments.
42. RF measurement summary of ISAC DLT tanks and DTL bunchers.
43. Completion and operations of ISAC-I and extension to ISAC-II.
44. Reducing phase-dependent emittance growth with local flattopping.
45. Initial operating experience with the auxiliary accelerating cavity for the TRIUMF cyclotron.
46. Use of the LANA code for the design of a heavy ion linac.
47. A separated function drift-tube linac for the ISAC project at TRIUMF.
48. A triple gap resonator design for the separated function DTL at TRIUMF.
49. Beam dynamics studies on the ISAC RFQ at TRIUMF.
50. Status of the TRIUMP-ISAC facility for accelerating radioactive beams.
Catalog
Books, media, physical & digital resources
Discovery Service for Jio Institute Digital Library
For full access to our library's resources, please sign in.