Search

Your search keyword '"Kyparisis, George J."' showing total 146 results

Search Constraints

Start Over You searched for: Author "Kyparisis, George J." Remove constraint Author: "Kyparisis, George J."
146 results on '"Kyparisis, George J."'

Search Results

7. Simultaneous minimisation of mean and variation of waiting times in a two-stage proportionate blocking flow shop.

10. The no-wait flow shop with rejection.

17. Competition in two-tier serial and assembly supply chains with general consumer utility functions.

19. A unified analysis for the single-machine scheduling problem with controllable and non-controllable variable job processing times

20. Single-machine scheduling with waiting-time-dependent due dates

21. An improved delayed-start LPT algorithm for a partition problem on two identical parallel machines

22. A note on the two-stage assembly flow shop scheduling problem with uniform parallel machines

23. A note on performance guarantees for sequencing three-stage flexible flowshops with identical machines to minimize makespan

24. Single-machine and two-machine flowshop scheduling with general learning functions

25. A note on makespan minimization in two-stage flexible flow shops with uniform machines

26. Performance guarantees for flowshop heuristics to minimize makespan

27. Flexible flow shop scheduling with uniform parallel machines

29. Algorithms with performance guarantees for flow shops with regular objective functions

30. Makespan minimization on uniform parallel machines with release times

31. Concurrent flowshop scheduling to minimize makespan

32. Assembly-line scheduling with concurrent operations and parallel machines

35. Single machine scheduling with release times, deadlines and tardiness objectives

36. A note on scheduling flowshops with flexible stage ordering

38. Flow shop and open shop scheduling with a critical machine and two operations per job

39. E-business: a review of research published in Production and Operations Management (1992-2008)

40. Project selection with discounted returns and multiple constraints

41. A decision model for interdependent information system project selection

44. A note on the effects of downstream efficiency on upstream pricing

50. A note on the proportionate flow shop with a bottleneck machine

Catalog

Books, media, physical & digital resources