Search

Your search keyword '"K. Akai"' showing total 222 results

Search Constraints

Start Over You searched for: Author "K. Akai" Remove constraint Author: "K. Akai"
222 results on '"K. Akai"'

Search Results

1. Bunch-by-bunch measurements of the betatron tune and the synchronous phase and their applications to beam dynamics at KEKB

3. RF systems for the KEK B-Factory

4. Purification of organic mud by the 'UTSURO'

5. Effects of site-directed removal of N-glycosylation sites in human erythropoietin on its production and biological properties

6. Compensationof the crossing angle with crab cavities at KEKB

7. Small angle crab compensation for LHC IR upgrade

8. Beam operation with crab cavities at KEKB

9. Beam-beam effects observed at KEKB

10. Evidence of the Purely Leptonic DecayB−→τ−ν¯τ

11. New Design of Crab Cavity for SuperKEKB

12. Recent Progress at KEKB

13. Observation ofB0→π0π0

14. Observation of B0--pi0pi0

15. Evidence for DirectCPViolation inB0→K+π−Decays

16. Observation of LargeCPViolation and Evidence for DirectCPViolation inB0→π+π−Decays

17. High intensity issues for super B-factories

18. Upper Bound on the Decayτ→μγfrom the Belle Detector

19. Observation of large CP violation and evidence for direct CP violation in B0--pi(+)pi(-) decays

20. Observation of theDsJ(2317)andDsJ(2457)inBDecays

21. Observation ofB→K*ℓ+ℓ−

22. Observation of a Narrow Charmoniumlike State in ExclusiveB±→K±π+π−J/ψDecays

23. Upper bound on the decay tau--microgamma from the Belle detector

24. Observation of B--K*l+l

25. Observation of a narrow charmoniumlike state in exclusive B+/---K+/-pi+pi-J/psi decays

26. Evidence for B0--pi0pi0

27. Measurement of time-dependent CP-violating asymmetries in B0--phiK(0)S, K+K-K0(S), and eta'K0(S) decays

28. Observation of the D(sJ)(2317) and D(sJ)(2457) in B decays

29. Evidence forCP-violating asymmetries inB0→π+π−decays and constraints on the CKM angleφ2

30. Study of time-dependentCP-violating asymmetries inb→sq¯qdecays

31. The superconductivity cavity system for KEKB

32. Lattice diagnostics using single kick closed orbit at KEKB

33. Test Accelerator Facility for linear collider

34. Robust stabilization of a flexible arm

35. Upgrading of TRISTAN by superconducting RF system

36. Update of the TRISTAN superconducting RF system

37. The interaction of a beam with a beam line higher-order mode absorber

38. Operational experience with the TRISTAN superconducting RF system

39. Beam test results on HOM absorber of superconducting cavity for KEKB

40. High beam current experiments for the KEKB conducted at the TRISTAN Accumulation Ring

41. Fundamental mode characteristics of ARES cavity under beam environment

42. Beam test of a superconducting damped cavity for KEKB

43. HOM characteristics of the ARES cavity

44. Coupling cavity damper for the ARES

45. An accelerator resonantly coupled with an energy storage (ARES) for the KEKB

46. HOM absorber for the KEKB normal conducting cavity

47. Development of high-power ARES cavities

48. HOM absorber for the ARES cavity

49. Accelerator design at SuperKEKB

50. Development of a HOM-damped cavity for the KEK B-factory (KEKB)

Catalog

Books, media, physical & digital resources