Search

Your search keyword '"J Graceffa"' showing total 37 results

Search Constraints

Start Over You searched for: Author "J Graceffa" Remove constraint Author: "J Graceffa"
37 results on '"J Graceffa"'

Search Results

1. Overview of the design of the ITER heating neutral beam injectors

2. The PRIMA Test Facility: SPIDER and MITICA test-beds for ITER neutral beam injectors

3. The fabrication and assembly of the beam source for the SPIDER experiment

4. On the road to ITER NBIs: SPIDER improvement after first operation and MITICA construction progress

5. Heating Neutral Beams for ITER: Present Status

6. Spider beam source ready for operation

7. Progress in the ITER neutral beam test facility

8. Some aspects of the design of the ITER NBI Active Correction and Compensation Coils

9. Design and R&D for manufacturing the beamline components of MITICA and ITER HNBs

10. Update on the negative ion based neutral beam injectors for ITER

11. The ITER neutral beam front end components integration

12. DNB exit scraper—Concept and engineering

13. Structural analyses of HV bushing for ITER heating NB system

14. A substantial step forward in the realization of the ITER HNB system: The ITER NBI Test Facility

15. The ITER Neutral Beam Test Facility toward SPIDER operation

16. Remote handling concept for the neutral beam system

17. The ITER Neutral Beam Test Facility toward SPIDER Operation

18. Final design of the beam source for the MITICA injector

19. Powerloads on the front end components and the duct of the heating and diagnostic neutral beam lines at ITER

20. Progress in the realization of the PRIMA neutral beam test facility

21. Manufacturing of the full size prototype of the ion source for the ITER neutral beam injector – The SPIDER beam source

22. First boundary electrical feedthroughs for the heating neutral beams injectors of ITER

23. ITER neutral beam Vacuum Vessel design

24. An alternative design concept for the DNB calorimeter motion mechanism

25. Final design of the beam source for the MITICA injector

26. Proposal of actively heated, long stem based Cs delivery system for diagnostic neutral beam source in ITER

27. The ITER Neutral Beam Vacuum Vessel design

28. Overview of the iter negative-ion-based neutral beam injector and its development

29. EU development of the ITER Neutral beam injector and test facilities

30. Status of the 1 MeV Accelerator Design for ITER NBI

31. STATUS OF THE ITER HEATING NEUTRAL BEAM SYSTEM

32. PROGRESS ON THE HEATING AND CURRENT DRIVE SYSTEMS FOR ITER

33. Overview of the negative ion based neutral beam injectors for ITER

35. Progress in the realization of the PRIMA neutral beam test facility.

36. First operation in SPIDER and the path to complete MITICA.

37. Rutherford, Priviteria, and Chad Green: Laetrile's setbacks in the courts.

Catalog

Books, media, physical & digital resources