18 results on '"Hosseinian, Amir Hossein"'
Search Results
2. Multi-skilled resource-constrained multi-project scheduling problem with dexterity improvement of workforce
3. Identifying the influential factors on the effectiveness of industrial parks and using an MCDM method to rank them: case study of Iran
4. A two-phase approach for solving the multi-skill resource-constrained multi-project scheduling problem: a case study in construction industry
5. A community detection approach for the resource leveling problem in a multi-project scheduling environment
6. PROPOSING AN INDIGENOUS SUSTAINABLE METHODOLOGY FOR EVALUATING THE EFFECTIVENESS OF INDUSTRIAL PARKS: A REAL-LIFE APPLICATION IN IRAN
7. A bi-objective model for redundancy allocation problem in designing server farms: mathematical formulation and solution approaches
8. P-GWO and MOFA: two new algorithms for the MSRCPSP with the deterioration effect and financial constraints (case study of a gas treating company)
9. Stochastic vehicle routing problem with heterogeneous vehicles and multiple prioritized time windows: Mathematical modeling and solution approach
10. Modeling of the time-dependent multi-skilled RCPSP considering learning effect : An evolutionary solution approach
11. PROPOSING AN INDIGENOUS SUSTAINABLE METHODOLOGY FOR EVALUATING THE EFFECTIVENESS OF INDUSTRIAL PARKS: A REAL-LIFE APPLICATION IN IRAN.
12. Identifying the influential factors on the effectiveness of industrial parks and using an MCDM method to rank them: case study of Iran
13. A two-phase approach for solving the multi-skill resource-constrained multi-project scheduling problem: a case study in construction industry
14. A multi-objective multi-agent optimization algorithm for the multi-skill resource-constrained project scheduling problem with transfer times
15. A Multi-Objective Mathematical Formulation for the Airline Crew Scheduling Problem: MODE and NSGA-II Solution Approaches
16. A hybrid NSGA-II-DEA method for the economic-statistical design of the C-control charts with multiple assignable causes
17. A hybrid NSGA-II-DEA method for the economic-statistical design of the C-control charts with multiple assignable causes
18. An Energy-efficient Mathematical Model for the Resource-constrained Project Scheduling Problem: An Evolutionary Algorithm.
Catalog
Books, media, physical & digital resources
Discovery Service for Jio Institute Digital Library
For full access to our library's resources, please sign in.