1. Commissioning of the Beam Instrumentation for the Half Sector Test in Linac4 with a 160 MeV H⁻ Beam
- Author
-
Guidoboni, Greta, Allica, Juan, Bracco, Chiara, Burger, Stephane, Focker, Gerrit Jan, Mikulec, Bettina, Navarro Fernandez, Araceli, Roncarolo, Federico, Søby, Lars, and Zamantzas, Christos
- Subjects
2 Overview and Commissioning ,Accelerators and Storage Rings ,Accelerator Physics - Abstract
In the framework of the LHC Injector Upgrade (LIU) project, the Proton Synchrotron Booster (PSB) will be extensively modified during the Long Shutdown 2 (LS2, 2019-2020) at CERN [1]. This includes a new injector, Linac4, which will provide a 160 MeV H⁻ beam and a complete new injection section for the PSB composed essentially of a chicane and a stripping foil system. The equivalent of half of this new injection chicane, so-called Half-Sector Test (HST), was tempo-rarily installed in the Linac4 transfer line to evaluate the performance of the novel beam instrumentation, such as, stripping foils, monitoring screens, beam cur-rent transformers, H⁰/H⁻ monitor and dump, beam loss monitors, and beam position monitors. The results of the instrumentation commissioning of the HST are presented in this paper., Proceedings of the 6th Int. Beam Instrumentation Conf., IBIC2017, Grand Rapids, MI, USA
- Published
- 2018
- Full Text
- View/download PDF