Search

Your search keyword '"Echevarria, Pablo"' showing total 48 results

Search Constraints

Start Over You searched for: Author "Echevarria, Pablo" Remove constraint Author: "Echevarria, Pablo"
48 results on '"Echevarria, Pablo"'

Search Results

1. Control algorithm tests using a virtual CW SRF cavity

2. Modified active disturbance rejection control scheme for systems with time delay

3. Modified active disturbance rejection control scheme for systems with time delay.

5. The EC-Earth3 Earth system model for the Coupled Model Intercomparison Project 6

6. The EC-Earth3 Earth system model for the Coupled Model Intercomparison Project 6

7. The EC-Earth3 Earth system model for the Coupled Model Intercomparison Project 6

8. The EC-Earth3 Earth system model for the Coupled Model Intercomparison Project 6

9. The EC-Earth3 Earth system model for the Coupled Model Intercomparison Project 6

10. bERLinPro Becomes SEALab: Status and Perspective of the Energy Recovery Linac at HZB

11. Collision tumor of the thyroid: follicular thyroid carcinoma plus metastatic renal cell carcinoma

12. A Novel Initialization Technique for Decadal Climate Predictions

13. Collision tumor of the thyroid: follicular thyroid carcinoma plus metastatic renal cell carcinoma

14. Final Design Studies for the VSR DEMO 1.5 GHz Coupler

15. A novel initialization technique for decadal climate predictions

16. Assessment of a full-field initialized decadal climate prediction system with the CMIP6 version of EC-Earth

17. The EC-Earth3 Earth System Model for the Climate Model Intercomparison Project 6

18. Status of the Control System for the Energy Recovery Linac BERLinPro at HZB

19. The Berlin Energy Recovery Linac Project BERLinPro - Status, Plans and Future Opportunities

21. Simulation of quench detection algorithms for Helmholtz Zentrum Berlin SRF cavities

22. Virtual SRF Cavity: Testing SRF Cavity Support Systems Without the Hassle of Liquid Helium and Klystrons

23. Status Report of the Berlin Energy Recovery Linac Project BERLinPro

24. The BERLinPro SRF Photoinjector System - From First RF Commissioning to First Beam

25. SRF Cavity Simulator for LLRF Algorithms Debugging

26. MESA - Status of the Implementation of the MicroTCA.4-based LLRF Control System

27. Developing Kalman Filter Based Detuning Control with a Digital SRF CW Cavity Simulator

28. The EC-Earth3 Earth System Model for the Climate Model Intercomparison Project 6.

29. Setup and Status of an SRF Photoinjector for Energy-Recovery Linac Applications

30. Detuning Compensation in SC Cavities Using Kalman Filters

31. Status of the Berlin Energy Recovery Linac Project BERLinPro

32. Final Acceptance Test of SRF Photo-Injector Cold String for the BERLinPro Energy Recovery Linac

33. Experience with Single Cavity and Piezo Controls for Short, Long Pulse and CW Operation

36. First LLRF Tests of BERLinPro Gun Cavity Prototype

37. MicroTCA.4 based Single Cavity Regulation including Piezo Controls

38. Progress Report of the Berlin Energy Recovery Project BERLinPro

40. RF Feedback and Detuning Studies for the BESSY Variable Pulse Length Storage Ring Higher Harmonic SC Cavities

41. Proyecto de urbanización del ámbito R 10 - San Blas, TM de Leguito (Álava)

42. Proyecto de urbanización del ámbito R 10 - San Blas, TM de Leguito (Álava)

44. Perspectivas de futuro para la playa de s'Abanell

45. Digital Hardware Implementation of High Dimensional Fuzzy Systems.

46. Perspectivas de futuro para la playa de s'Abanell

47. Status Report of the Berlin Energy Recovery Linac Project BERLinPro

Catalog

Books, media, physical & digital resources