Search

Your search keyword '"Dams -- Economic aspects"' showing total 226 results

Search Constraints

Start Over You searched for: Descriptor "Dams -- Economic aspects" Remove constraint Descriptor: "Dams -- Economic aspects"
226 results on '"Dams -- Economic aspects"'

Search Results

2. Dams Dispute: White House support for salmon recovery fails to resolve dispute

4. Carrying Out Technical, Economic, Financial, Environmental, Social And Transactional Feasibility Studies For The Construction Of A Hydroelectric Power Station At The Foot Of The Mbakaou Reservoir Dam, And The Installation Of Photovoltaic Units

5. COSTITUENDO R.T.I. GORRASI COST. SRL/PROGETTO IMPRESA SRL secures contract for Construction Work for Dams, Canals, Irrigation Channels and Aqueducts - 'Extraordinary maintenance - Extraordinary maintenance works for the adaptation and recalibratory of the

6. Land Water secures contract for SW - Holbeam Dam - ECC PM Cost Management Support

7. Cost. ATI CONSORZIO INTEGRA SOC. COOP. (mandataria) ­ EDILAP S.R.L. (consorziata esecutrice) ­ COSPIN S.R.L. (mandante) secures contract for Construction Work for Dams, Canals, Irrigation Channels and Aqueducts - CT_003 Palagonia - Procurement for the awa

8. Scientists Develop Tool To Predict Dam Removal Costs; Up To 32,000 U.S. Dams May Be Removed By 2050

9. Repairing Alignment And Replacement Of Electrically Operated Hoist With Spares Of Gantry Crane And Stop Log Gates Of Kaushalya Dam Panchkula.this Rough Cost Estimate Amounting To Rs. 20.05 Lacs Has Been Approved In 55th Meeting Of Hsdrandfcb At Sr. N

12. Improvement To Kashti Savarde Road, Tal. Mokhada, Dist. Palghar (estimated Cost Rs. 8, 22, 744/-) #1 Improvement To Shirsonpada Road, Tal. Mokhada, Dist. Palghar (estimated Cost Rs. 8, 21, 113/-) #1 Improvement To S.h.78 To Palaspada Dam Road, Tal. Mokhad

16. Providing Balance Cement Concrete Road Near Bc Colony Road From Existing Road Dam To Bc Colony At K.yerragudi (v&gp) Of Chakrayapeta Mandal In Ysr Kadapa District, Estimate Cost Rs.30.00 Lakhs

19. GENERAL DESIGN TECH secures contract for Project and design preparation, estimation of costs - Technical documentation for execution Repair works Capital Mobile Dam with Stavile Segment and Technical Documentation for Execution Repair works Capital Tower

20. Hydro Proiect Invest secures contract for Project and design preparation, estimation of costs - Technical documentation for execution Repair works Capital Mobile Dam with Stavile Segment and Technical Documentation for Execution Repair works Capital Tower

23. Baroji : - Rough Cost Estimate For Executing Tank|dam And Solar Power Based Micro-irrigation Project At Village Baroji Of District And Block Nuh (mewat)

24. Providing Security Arrangement For P.i. Division, Balimela For The Period From April 2023 To March 2024 Supplying Of Security Guards Including Daily Wages, All Costs, All Allowances, Epf Dues, All Taxes As Applicable, Cess Etc. Complete In All Respe

25. STUDIO GRIFFINI S.R.L. secures contract for Dam-design services - Open procedure for the assignment of the assignment for the 'design of technical and economic feasibility', 'definitive design' and 'executive design' for the restoration of the Abate dam

26. Groups Want Expedited Study To Deauthorize Power Production At Two Corps' Willamette Dams To Reduce Costs, Aid ESA-Listed Salmon, Steelhead

28. EPA Commits $727M in Low-Cost Loans for Anderson Dam and Coyote Creek

37. Up-keeping Of Electric Power Distribution System At Mahi Dam Campus Including Residential And Non Residential Building (excluding Cost Of Material) With Compliance Of Special Condition Of The Work. .#* Maintenance Of Dams

40. Home buybacks in flood-prone NSW 'cheaper' than plan to raise Warragamba Dam wall, experts say

41. Waimea dam cost blows out again to $195m, more delays tipped

43. PNW Waterways Association Releases Consultants' Study On Costs Of Lower Snake Dam Removal And No Barging

44. Advancing species recovery and sustainable fisheries: NOAA's role in US hydropower

45. Water war

48. Mission of Boulder Dam fulfilled

49. Significance of Boulder Canyon project

Catalog

Books, media, physical & digital resources